INSTALLATION - 2
2.6
BLOWDOWN VALVE
There are four blowdown valves on the boiler, the boiler blowdown valve at the rear of the boiler,
the water column blowdown valve and two water level gauge (sight glass) blowdown valves.
All of these valves must be connected to a blowdown receptacle of approved design.
Regulations exist covering such items and care must be taken to ensure compliance with these
regulations.
If in doubt regarding blowdown arrangements, consult Fulton Ltd.
Note:
8J - 15J main blowdown connection is via a branch pipe.
Note:
20J - 60J main blowdown connection is integral, via a boiler mounted flange.
Where possible the main blowdown pipework on 20J - 60J boilers should drop down to a union connection to
allow removal of the inspection flange without the necessity to remove the blowdown pipework.
Figure. 6 - Boiler Blowdown- models 8J - 15J (skid
mounted boiler shown)
Figure. 7 - Boiler Blowdown- models 20J - 60J
(skid mounted boiler shown)
Summary of Contents for J Series
Page 2: ...JGASUK IOMM 2015 2 Fulton Ltd Page II ...
Page 54: ...JGASUK IOMM 2015 2 Fulton Ltd Page 48 APPENDIX A ...
Page 58: ...JGASUK IOMM 2015 2 Fulton Ltd Page 52 APPENDIX A ...
Page 60: ...JGASUK IOMM 2015 2 Fulton Ltd Page 54 ...
Page 62: ...JGASUK IOMM 2015 2 Fulton Ltd Page 56 ...