JGASUK-IOMM-2015-2
Fulton Ltd
Page III
TABLE OF CONTENTS
SECTION 1 - INTRODUCTION
1.1 General
1
1.2
Technical Data
1
SECTION 2 - INSTALLATION
2.1 General
3
2.2 Siting
3
2.3 Ventilation
4
2.4
Flue Outlet
4
2.5
Water Supply
6
2.6
Blowdown Valve
7
2.7
Main Steam Valve
8
2.8
Steam Safety Valves
8
2.9
Water Level Gauge Set (sight glass)
8
2.10 Gas Supply
8
2.10.1 Gas Valve with Pilot Gas Line
9
2.11
Electrical Requirements
9
2.12 Steam Pressure Gauge
9
2.13 Commissioning the Boiler
11
2.13.1 Boiler Inspection and Initial Firing
11
2.13.2 Setting Burner Controls-low/high fire (40J-60J)
14
2.13.3 Setting Burner Controls-fully modulating (30J-60J)
14
2.14 Multi Bloc Gas Valves
15
2.15 Cleaning Steam Lines and Pressure Vessels
18
SECTION 3 - OPERATION
3.1 General
19
3.2
Boiler Controls
19
3.3
Indicator Lights
21
3.4
Filling the Boiler-all models
22
3.5
Starting the Burner-all models
23
SECTION 4 - MAINTENANCE
4.1
Visual Checks
25
4.2
Water Level and Low Water Safety Controls
25
4.2.1 Pump Test
25
4.2.2 1st Low Water Level Check
26
4.2.3 2nd Low Water Level Check
27
4.3
Main Blowdown
28
4.4
Water Column Blowdown
28
4.5
Water Level Gauge Blowdown
29
4.6
Evaporation Checks
30
4.7
Flame Sensor Test
30
4.8
Draining the Boiler
31
4.9
Long Term Shut Down
32
4.10 Internal Inspection
32
4.11
Schedule of Operator Tests and Checks
33
4.11.1 Daily
34
4.11.2 Weekly-in addition
34
4.11.3 Monthly-in addition
34
4.11.4 Three Monthly-in addition
35
4.11.5 Six Monthly-in addition
35
4.11.6 Annually-in addition
37
4.12.1 Troubleshooting-boiler
38
4.12.2 Troubleshooting-feedwater pump
41
4.12.3 Troubleshooting-burner control unit-LFL1
43
4.13 Maintenance Log
45
APPENDIX A - TI SHEETS
APPENDIX B - WATER LEVEL PROBE INFO
APPENDIX C - MOTORISED HIGH/LOW CONTROL
1.1 General
57
1.2 Operation
57
1.3
Additional Controls
58
1.4 Commissioning
58
1.4.1 Fuel Input Rates
58
1.4.2 Air Damper Motor - Factory Cam Settings
58
1.4.3 Setup Procedure
59
1.5
Spare Parts
59
APPENDIX D - SPIRAX HIGH INTEGRITY LEVEL
CONTROLS
1.1
Daily Tests
61
1.1.1 1st Low Water-daily
61
1.1.2 2nd Low Water-daily
61
1.2
Weekly Test-in addition
62
1.2.1 1st Low Water-weekly in addition
62
1.2.2 2nd Low Water-weekly in addition
62
APPENDIX E - AUTOMATIC TDS BLOWDOWN
SYSTEM
1.1 General
63
Electrical diagrams supplied separately
Summary of Contents for J Series
Page 2: ...JGASUK IOMM 2015 2 Fulton Ltd Page II ...
Page 54: ...JGASUK IOMM 2015 2 Fulton Ltd Page 48 APPENDIX A ...
Page 58: ...JGASUK IOMM 2015 2 Fulton Ltd Page 52 APPENDIX A ...
Page 60: ...JGASUK IOMM 2015 2 Fulton Ltd Page 54 ...
Page 62: ...JGASUK IOMM 2015 2 Fulton Ltd Page 56 ...