JGASUK-IOMM-2015-2
Fulton Ltd
Page 24
MAINTENANCE - 4
Figure. 19 - Boiler Maintenance
Monobloc gas valve
Low water level probes
Water column containing
water level probes
Water column
blowdown valve
Water level gauge
(sight glass)
Water level gauge
blowdown valves
Steam pressure limiter
Clean out handhole
(water jacket)
Steam pressure control
Pressure gauge
Air pressure
switch
Air intake
Boiler control
panel
Control box
door lock
Control box
isolator switch
Clean out door
(furnace)
Feedwater
dip pipe
Removing/replacing
water level probe
Summary of Contents for J Series
Page 2: ...JGASUK IOMM 2015 2 Fulton Ltd Page II ...
Page 54: ...JGASUK IOMM 2015 2 Fulton Ltd Page 48 APPENDIX A ...
Page 58: ...JGASUK IOMM 2015 2 Fulton Ltd Page 52 APPENDIX A ...
Page 60: ...JGASUK IOMM 2015 2 Fulton Ltd Page 54 ...
Page 62: ...JGASUK IOMM 2015 2 Fulton Ltd Page 56 ...