JGASUK-IOMM-2015-2
Fulton Ltd
Page 34
MAINTENANCE - 4
4.11.1
DAILY
4.11.2
WEEKLY
IN ADDITION
4.11.3
MONTHLY
IN ADDITION
1.
Visually inspect the steam and feedwater pipework, valves and fittings for signs of leakage.
If leaks are suspected, shut the system down and evacuate the system to atmospheric
pressure before attempting to repair the leaks.
2. Blowdown the Boiler (see
Section 4.3
).
Note: If the boiler is being operated automatically on a time clock, the blowdown may be done once during the
working day and once at the end of the day when generating 10 psig or less, providing this is sufficient to
control the TDS level within limits.
3. Blowdown the Water Column (see
Section 4.4
).
4. Blowdown the Water Level Gauge (sight glass), (see
Section 4.5).
WARNING
Ensure the fittings around the steam safety valve(s) are secure.
The safety valve will be very hot, do not operate the safety valve without protection.
!
5. Ensure that the pipe from the safety valve outlet is not damaged and that it continues to a safe
blowdown point.
6. Pump Test (see
Section 4.2.1
).
7. First Low Water Check (see
Section 4.2.2
).
8. Second Low Water Check (see
Section 4.2.3
).
9. Flame Sensor Test (see
Section 4.7).
WARNING
Ensure the main electrical supply is isolated before starting work.
!
10. Visually inspect the internal water space (see
Section 4.10
).
11. Visually inspect the hand holes in the boiler. If any leakage is evident, the gasket needs
replacing.
12.
Visually inspect the flanged joint covering the rear inspection port in which the blowdown valve
is fitted, if any leakage is evident, the gasket needs replacing.
13. Clean the water level gauges (sight glasses).
If any leakage is evident, the gasket needs replacing.
14.
Clean any water traps and strainers fitted in the feedwater line.
Check feedwater and boiler water quality against the values given in
Appendix A - TI-139-
Recommended Water Conditions.
Note: Use only genuine Fulton replacement parts.
Summary of Contents for J Series
Page 2: ...JGASUK IOMM 2015 2 Fulton Ltd Page II ...
Page 54: ...JGASUK IOMM 2015 2 Fulton Ltd Page 48 APPENDIX A ...
Page 58: ...JGASUK IOMM 2015 2 Fulton Ltd Page 52 APPENDIX A ...
Page 60: ...JGASUK IOMM 2015 2 Fulton Ltd Page 54 ...
Page 62: ...JGASUK IOMM 2015 2 Fulton Ltd Page 56 ...