To execute auto shutdown after power fail, you should install the FJBU
management software. How to install and configure the FJBU
management software, see the “Fujitsu Battery Unit" user guide.
6.5.2
Removing an FJBU
Customer Replaceable
Unit (CRU)
Hardware: 5 minutes
Tools:
tool-less
Note for servers using CMA (Cable Management Arm)
Regarding of removing the FJBU, additional tasks are needed, due to an
interference between CMA stopper and the FJBU.
▶
Push the lock spring inward to unlock the CMA stopper, see
.
CAUTION
▶
In case of not enough space at the under side, unlock the CMA
stopper of the server below and pull out the CMA to the rear
side.
▶
Remove the CMA stopper with the mounted crossbar, see
.
▶
Hold the CMA stopper, the crossbar and the CMA including cables in the
one hand.
▶
) and install the new PSU carefully.
▶
Mount the complete assembly (CMA stopper, the crossbar and the CMA)
again into the rail.
Preliminary steps
No steps needed.
Power supply unit (PSU)
TX1330 M4
Upgrade and Maintenance Manual
161
Summary of Contents for PRIMERGY TX1330 M4
Page 18: ...Content Upgrade and Maintenance Manual TX1330 M4 ...
Page 276: ...Hard disk drive HDD solid state disk SSD 276 Upgrade and Maintenance Manual TX1330 M4 ...
Page 286: ...Fans 286 Upgrade and Maintenance Manual TX1330 M4 ...
Page 330: ...Expansion cards and backup units 330 Upgrade and Maintenance Manual TX1330 M4 ...
Page 340: ...Main memory 340 Upgrade and Maintenance Manual TX1330 M4 ...
Page 402: ...Accessible drives 402 Upgrade and Maintenance Manual TX1330 M4 ...
Page 474: ...Converting a floorstand model to a rack model 474 Upgrade and Maintenance Manual TX1330 M4 ...
Page 486: ...Cabling 486 Upgrade and Maintenance Manual TX1330 M4 ...
Page 518: ...Appendix A 518 Upgrade and Maintenance Manual TX1330 M4 ...
Page 560: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...