Figure 36: Locking the cable clamp of a PSU
▶
Pull the cable clamp up (1).
▶
Thread the power cord through the cable clamp (2).
▶
Press the cable clamp down until it engages to secure the cable (3).
It will take about 60 seconds until the server can be powered on.
4.7
Switching on the server
CAUTION
▶
Before switching on the server, make sure the top cover is closed.
In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
server must not run while the top cover is removed.
▶
"Important information" on page 31
.
Basic hardware procedures
TX1330 M4
Upgrade and Maintenance Manual
81
Summary of Contents for PRIMERGY TX1330 M4
Page 18: ...Content Upgrade and Maintenance Manual TX1330 M4 ...
Page 276: ...Hard disk drive HDD solid state disk SSD 276 Upgrade and Maintenance Manual TX1330 M4 ...
Page 286: ...Fans 286 Upgrade and Maintenance Manual TX1330 M4 ...
Page 330: ...Expansion cards and backup units 330 Upgrade and Maintenance Manual TX1330 M4 ...
Page 340: ...Main memory 340 Upgrade and Maintenance Manual TX1330 M4 ...
Page 402: ...Accessible drives 402 Upgrade and Maintenance Manual TX1330 M4 ...
Page 474: ...Converting a floorstand model to a rack model 474 Upgrade and Maintenance Manual TX1330 M4 ...
Page 486: ...Cabling 486 Upgrade and Maintenance Manual TX1330 M4 ...
Page 518: ...Appendix A 518 Upgrade and Maintenance Manual TX1330 M4 ...
Page 560: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...