
The second hole is for M.2 SSDs with 110 mm length (see orange
circles). If necessary, move the M.2 lock to the second hole, see
"Moving the M.2 lock to the second hole" on page 196
15.5.2 Installing an M.2 SSD
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Software: 15 minutes
Tools:
tool-less
Preliminary steps
▶
"Unlocking the server" on page 39
.
▶
"Removing the bay cover" on page 40
▶
"Shutting down the server" on page 41
▶
"Disconnecting the power cord" on page 42
▶
"Getting access to the component" on page 43
▶
Remove the front fan, see
"Removing the defective front fan" on page 106
.
▶
If applicable, remove an expansion card, see
Moving the M.2 lock to the second hole
This step is only necessary when installing M.2 SSDs with 110 mm
length.
System board and components
196
Upgrade and Maintenance Manual
TX1310 M5
Summary of Contents for PRIMERGY TX1310 M5
Page 14: ...Content Upgrade and Maintenance Manual TX1310 M5 ...
Page 80: ...Power supply unit PSU 80 Upgrade and Maintenance Manual TX1310 M5 ...
Page 124: ...Expansion cards 124 Upgrade and Maintenance Manual TX1310 M5 ...
Page 156: ...Processor CPU 156 Upgrade and Maintenance Manual TX1310 M5 ...
Page 174: ...Front panel and front USB 174 Upgrade and Maintenance Manual TX1310 M5 ...
Page 216: ...System board and components 216 Upgrade and Maintenance Manual TX1310 M5 ...
Page 238: ...Appendix A 238 Upgrade and Maintenance Manual TX1310 M5 ...
Page 257: ...List of all used screws for PRIMERGY Servers Assembled in WCZ and FIT July 2021 ...