
10.3
Installing memory modules
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools:
tool-less
CAUTION
▶
Use only released configurations to ensure a faultless operation of
the system.
▶
Before changing the memory configuration, verify if the
configuration is released. Please contact your sales outlet or our
customer service center.
Preliminary steps
▶
"Suspending BitLocker functionality" on page 65
.
▶
"Shutting down the server" on page 45
.
▶
"Disconnecting the power cord" on page 46
.
▶
"Getting access to the component" on page 47
▶
"Removing the air duct" on page 58
.
Selecting the memory slot
▶
Choose the memory slot according to the configuration rules, see
Installing a memory module
Figure 151: Opening the securing clips
Main memory
RX2520 M5
Upgrade and Maintenance Manual
263
Summary of Contents for PRIMERGY RX2520 M5
Page 100: ...Basic software procedures 100 Upgrade and Maintenance Manual RX2520 M5 ...
Page 122: ...Power supply unit PSU 122 Upgrade and Maintenance Manual RX2520 M5 ...
Page 290: ...Processor CPU 290 Upgrade and Maintenance Manual RX2520 M5 ...
Page 344: ...Accessible drives 344 Upgrade and Maintenance Manual RX2520 M5 ...
Page 378: ...Front panel 378 Upgrade and Maintenance Manual RX2520 M5 ...
Page 386: ...Serial interface 386 Upgrade and Maintenance Manual RX2520 M5 ...
Page 432: ...System board and components 432 Upgrade and Maintenance Manual RX2520 M5 ...
Page 462: ...Appendix A 462 Upgrade and Maintenance Manual RX2520 M5 ...
Page 503: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...