If the PCIe SSD module is controlled by a RAID controller of the PRAID
EP5x0i family, the PCIe SSD module can be installed during operation
(hot-plug), see
"Installing 2.5-inch HDD/SSD modules" on page 172
.
Preliminary steps
▶
Locate the correct drive bay, see
"Overview of configurations" on page 167
▶
Depending on your OS (see the "NVMe User Guide"):
Removing a 2.5-inch HDD/SSD dummy module
Figure 90: Removing a 2.5-inch HDD/SSD dummy module
▶
Press both tabs together (1) and pull the dummy module out of its bay (2).
CAUTION
▶
Keep the dummy module for future use.
▶
Always replace dummy modules into unused HDD/SSD bays to
comply with applicable EMC regulations and satisfy cooling
requirements.
Hard disk drive (HDD) / solid state disk (SSD)
180
Upgrade and Maintenance Manual
RX2520 M5
Summary of Contents for PRIMERGY RX2520 M5
Page 100: ...Basic software procedures 100 Upgrade and Maintenance Manual RX2520 M5 ...
Page 122: ...Power supply unit PSU 122 Upgrade and Maintenance Manual RX2520 M5 ...
Page 290: ...Processor CPU 290 Upgrade and Maintenance Manual RX2520 M5 ...
Page 344: ...Accessible drives 344 Upgrade and Maintenance Manual RX2520 M5 ...
Page 378: ...Front panel 378 Upgrade and Maintenance Manual RX2520 M5 ...
Page 386: ...Serial interface 386 Upgrade and Maintenance Manual RX2520 M5 ...
Page 432: ...System board and components 432 Upgrade and Maintenance Manual RX2520 M5 ...
Page 462: ...Appendix A 462 Upgrade and Maintenance Manual RX2520 M5 ...
Page 503: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...