▶
Only valid for non hot-plug components
Before installing/removing internal components to/from the server, turn off
the server, all peripheral devices, and any other connected devices. Also
unplug all power cords from the power outlet. Failure to do so can cause
electric shock or damage.
3.2.2
Before starting up
▶
During installation and before operating the server, observe the instructions
on environmental conditions for your server.
▶
If the server is brought in from a cold environment, condensation may form
both inside and on the outside of the server.
Wait until the server has acclimatized to room temperature and is absolutely
dry before starting it up. Material damage may be caused to the server if this
requirement is not observed.
▶
Only transport the server in its original packaging or in packaging that
protects it from impacts and jolts.
In Japan and APAC, transporting the server in its original packaging does
not apply.
3.2.3
Installation and operation
▶
This server should not be operated in ambient temperatures above 35 °C.
For servers with Advanced Thermal Design the ambient temperature can
increase to 40 °C or 45 °C.
▶
If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 connector, the power
supply's fuse protection must comply with the requirements for non-
industrial power supply networks for type A connectors.
▶
The server automatically adjusts itself to a mains voltage, see the type label
of your server. Ensure that the local mains voltage lies within these limits.
▶
This server must only be connected to properly grounded power outlets or
connected to the grounded rack internal power distribution server with tested
and approved power cords.
Important information
30
Upgrade and Maintenance Manual
RX2520 M5
Summary of Contents for PRIMERGY RX2520 M5
Page 100: ...Basic software procedures 100 Upgrade and Maintenance Manual RX2520 M5 ...
Page 122: ...Power supply unit PSU 122 Upgrade and Maintenance Manual RX2520 M5 ...
Page 290: ...Processor CPU 290 Upgrade and Maintenance Manual RX2520 M5 ...
Page 344: ...Accessible drives 344 Upgrade and Maintenance Manual RX2520 M5 ...
Page 378: ...Front panel 378 Upgrade and Maintenance Manual RX2520 M5 ...
Page 386: ...Serial interface 386 Upgrade and Maintenance Manual RX2520 M5 ...
Page 432: ...System board and components 432 Upgrade and Maintenance Manual RX2520 M5 ...
Page 462: ...Appendix A 462 Upgrade and Maintenance Manual RX2520 M5 ...
Page 503: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...