
For configurations below 32 kg:
At least two people are needed to lift the server into the
rack cabinet.
For configurations below 55 kg:
At least three people are needed to lift the server into
the rack cabinet.
For configurations above 55 kg:
At least four people are needed to lift the server into the
rack cabinet.
Additionally, a lifter is required in the following cases:
–
The server weighs more than 50 kg.
–
The server weighs more than 21 kg and is to be installed above the height of
25 U.
When using a lifter, this installation procedure needs to be carried out by
maintenance personnel.
Basic hardware procedures
RX2520 M5
Upgrade and Maintenance Manual
53
Summary of Contents for PRIMERGY RX2520 M5
Page 100: ...Basic software procedures 100 Upgrade and Maintenance Manual RX2520 M5 ...
Page 122: ...Power supply unit PSU 122 Upgrade and Maintenance Manual RX2520 M5 ...
Page 290: ...Processor CPU 290 Upgrade and Maintenance Manual RX2520 M5 ...
Page 344: ...Accessible drives 344 Upgrade and Maintenance Manual RX2520 M5 ...
Page 378: ...Front panel 378 Upgrade and Maintenance Manual RX2520 M5 ...
Page 386: ...Serial interface 386 Upgrade and Maintenance Manual RX2520 M5 ...
Page 432: ...System board and components 432 Upgrade and Maintenance Manual RX2520 M5 ...
Page 462: ...Appendix A 462 Upgrade and Maintenance Manual RX2520 M5 ...
Page 503: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...