
This step is only required when upgrading or replacing non-hot-plug
components.
▶
Inform the system administrator that the server will be shut down and put
offline.
▶
Terminate all applications.
▶
Perform the required procedures described in the preliminary steps of each
upgrade or maintenance task.
▶
Shut down the server.
If the system is running an ACPI-compliant operating system (OS),
pressing the On/Off button will perform a graceful shutdown.
4.3
Disconnecting the power cord
4.3.1
Disconnecting the power cord (AC PSU)
Figure 2: Unlocking the cable clamp of a PSU
Basic hardware procedures
46
Upgrade and Maintenance Manual
RX2520 M5
Summary of Contents for PRIMERGY RX2520 M5
Page 100: ...Basic software procedures 100 Upgrade and Maintenance Manual RX2520 M5 ...
Page 122: ...Power supply unit PSU 122 Upgrade and Maintenance Manual RX2520 M5 ...
Page 290: ...Processor CPU 290 Upgrade and Maintenance Manual RX2520 M5 ...
Page 344: ...Accessible drives 344 Upgrade and Maintenance Manual RX2520 M5 ...
Page 378: ...Front panel 378 Upgrade and Maintenance Manual RX2520 M5 ...
Page 386: ...Serial interface 386 Upgrade and Maintenance Manual RX2520 M5 ...
Page 432: ...System board and components 432 Upgrade and Maintenance Manual RX2520 M5 ...
Page 462: ...Appendix A 462 Upgrade and Maintenance Manual RX2520 M5 ...
Page 503: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...