
Installing the front VGA board
Figure 188: Installing the front VGA board
▶
Push the front VGA connector in the corresponding recess (1) and fasten
the front VGA board with two screws (2).
▶
Route the cable tie under the front VGA board (3).
Concluding steps
▶
"Installing the front panel module" on page 271
.
▶
▶
"Connecting the power cord" on page 56
▶
"Switching on the server" on page 58
13.4.2
Removing the front VGA board
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tools:
Phillips PH1 / (+) No. 1 screw driver
Front panel
RX1330 M4
Upgrade and Maintenance Manual
275
Summary of Contents for PRIMERGY RX1330 M4
Page 98: ...Basic software procedures 98 Upgrade and Maintenance Manual RX1330 M4 ...
Page 176: ...Hard disk drive HDD solid state drive SSD 176 Upgrade and Maintenance Manual RX1330 M4 ...
Page 290: ...Serial interface 290 Upgrade and Maintenance Manual RX1330 M4 ...
Page 364: ...Appendix A 364 Upgrade and Maintenance Manual RX1330 M4 ...
Page 398: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan February 2019 ...