![Fujitsu AB*G18LVTB Series Design & Technical Manual Download Page 334](http://html.mh-extra.com/html/fujitsu/ab-g18lvtb-series/ab-g18lvtb-series_design-and-technical-manual_118007334.webp)
- (05-105) -
SY
ST
EM
DE
SIGN
SY
ST
EM
DE
SIGN
Duct installation
z
Please fasten the connecting parts of the ducts with band, and wrap with vinyl tape to ensure no
•
air leaks. (Carry out the work to ensure no air leakage at a pressure of 200 Pa)
Please do not construct the duct in the manner of below.
•
○Extreme Bends
○Highly Repetitive Bends
○Making the Connecting Duct Diameters Smaller
Completion figure
Band (field supplied)
Vinyl tape (field supplied)
Duct (field supplied)
Indoor unit
Fresh air intake kit
Hanging band for duct
(field supplied)
When wiring of the duct fan is required please refer to “
■
FRESH AIR CONTROL OUTPUT”.