113
EN
-
completed coolant stop
Carry out the steps listed above on the
second coolant stop
Fitting new cool-
ant stops
Lightly lubricate the O-ring on the coo-
lant stop
Fit the ready-made coolant stop onto
the bit insert for the coolant stop (1) on
the manual torque wrench
Insert the coolant stop into a hole (2)
with a rotary movement
-
the rotary movement will not da-
mage the O-ring
Tighten coolant stop
-
Tightening torque = 3 Nm
Repeat the steps listed above on the
second coolant stop
And finally...
Thread the wire electrode into the hosepack
Connect the compressed air line to compressed air connection "A" on the torch body
changeover station
Establish the compressed air and power supply to the torch body changeover station
Place the torch body correctly onto the torch body coupling
7
(2)
(1)
(2)
NOTE!
Fit the coolant stops as far
as they will go onto the bit insert
on the manual torque wrench.
1
2
3
4
5
1
2
3
4
Summary of Contents for 4,044,008
Page 2: ...2...
Page 4: ...4...
Page 15: ...General information...
Page 16: ......
Page 24: ...24...
Page 25: ...Controls connections and mechani cal components...
Page 26: ......
Page 35: ...Installation and commissioning...
Page 36: ......
Page 65: ...65 EN 3 3...
Page 84: ...84...
Page 85: ...Troubleshooting...
Page 86: ......
Page 90: ...90...
Page 91: ...Care maintenance and disposal...
Page 92: ......
Page 126: ...126...
Page 127: ...Technical data...
Page 128: ......
Page 130: ...130...
Page 131: ...Appendix...
Page 132: ...132 Pneumatic diagram V23072012...
Page 134: ...134...
Page 135: ...135...