EXTERNAL T&G CLADDING
T&G SIDE PANEL 1
(AX)
T&G SIDE PANEL 2
(AZ)
T&G SIDE PANEL 3
(BA)
T&G SIDE PANEL 4
(BB)
T&G SIDE PANEL 4
(BB)
T&G WINDOW
PANEL
(BC)
T&G FRONT PANEL
(BE)
T&G FRONT PANEL
(BE)
T&G LINTEL & T&G KICK PLATE
(BG) & (BF)
T&G SIDE PANEL 6
(BI)
T&G SIDE PANEL 5
(BH)
T&G SIDE PANEL 5
(BH)
Begin applying the T&G cladding at the back (AZ).
99
99
Repeat the same process for the second back
panel (BI). Softly knock the second back panel into
the fi rst, so the T&G interlocks the panels together.
Use a rubber mallet for a softer application.
Repeat the same process for the (AX) T&G panel.
101
101
Use 6 x 80mm screws on each panel, 3 x 80mm
down each side of the cladded panel, through the
batten and into the wall panel behind. Leave the
screws slightly out in case of adjustment.
102
102
At each side, there will be a slight overhang of the
T&G board. The battens edge underneath should
be fl ush to the end. Use the 45 x 28mm batten as
a guide to leave 45mm from the ground.
100
100
T&G CLADDING LAYOUT
19