background image

02DTSHAX0505HGD1W-V1-PEFC

PLAYHOUSE - DIP TREATED SHIPLAP APEX 

5X5, HALF GLAZED DOOR, ONE WINDOW. 

In all instances for assistance with your product, please contact customer care on :  

01636 821215 or [email protected]

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

Please retain product label and instructions for future reference

        

General Instructions

BEFORE YOU START PLEASE READ THE INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed in the parts list provided. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a 

Phillips screwdriver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and 

a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

- Ensure you have enough time to build the product to ensure the building is water tight.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration 

of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may 

also occur during excessive dry spells due to natural processes. Unfortunately, these processes cannot be 

avoided but can be helped. It is suggested that the outdoor building is sprayed with water during 

extended periods of hot weather and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually 

to prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot 

guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a water-

proof treatment to prevent water ingress. Pressure Treated buildings - Require a waterproof treatment to 

prevent water ingress. Log Cabins - Are supplied untreated and require a preservative and waterproofing 

treatment.

We also recommend treating the building prior to construction.

POSITIONING YOUR PLAYHOUSE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment. 

We recommend a 

minimum space of 2m around a playhouse

, away from any structure or obstructions 

such as fences, garages, houses, overhanging branches, washing lines or electrical wires.

It is recommended that the position of the Playhouse is

 not in direct sunlight.

Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or 

any hard surface.

BUILDING A BASE 

Ensure the base is level and is built on firm ground, to prevent distortion, checking with a spirit level.  

Refer to diagrams for the base dimensions.  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is 

also recommended that the floor be at least 25mm above the surrounding ground level to avoid 

flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

- Wooden base.

CAUTION 

Wood is a natural product and can change post manufacture. So despite every effort being 

made to ensure the materials used are cut and machined to a clean and smooth finish, care 

must be taken when handling the product and preparing for use by your child.

Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a 

smoother finish. Alternatively, call the customer service department who will be happy to 
arrange replacement panels/parts.

 

WARNING: 

ONLY SUITABLE FOR DOMESTIC USE.

TO BE USED UNDER DIRECT SUPERVISION OF AN   ADULT.

THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY.

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY   

 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

ANY ADD ON OR ACCESSORY MUST BE FITTED ACCORDING TO 
THE INSTRUCTIONS PROVIDED

.

!

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products 

independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.

2mm Drill bit

12mm CSK

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be erected by 

atleast two adults.

DO NOT ALLOW 

CHILDREN TO ASSIST.

To prevent damage during 

assembly, you 

MUST

 pilot 

drill all screw holes and 

ensure all screw heads are 

countersunk.

For ease of assembly, you will 

need a tape measure to check 

dimensions of components.

**Protim Aquatan T5 (621)

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building has been treated by the correct application of 

Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and 

alcohols: 2, 4, 6-trichlorophenol.

www.merciagardenproducts.co.uk      P1

Measure 

under the 

head

Measure 

overall

length

 Screws & Nails

 Bolts

To identify the 

fixings required 

for each step use a 

measuring tape.

WARNING: Only for domestic use

Not suitable for children under 36 months due to 

small gaps and danger of falling from heights.

To be used under direct supervision of an adult

Summary of Contents for SI-002-001-0022

Page 1: ...r any hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller than the external measurement of the building i e The cladding should overlap the base creating a run off for water It is also recommended that the floor be at least 25mm above the su...

Page 2: ...I 002 001 0023 5x5 Playhouse With Half Glazed Door Tower Slide SI 002 001 0024 5x5 Playhouse With Half Glazed Door Tower Slide Swing SI 002 001 0025 Model Build Instructions Required 02DTSHAX0505HGD1W V1 PEFC Playhouse 02DTSHAX0505HGD1W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 02DTSHAX0505HGD1W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 02PATINCSWA V1 PEFC Swing Set 02DTSHAX0505HGD1W V1 PEFC P...

Page 3: ... QTY 1 PI 03 0009 Floor Joist 28x28x1500mm QTY 5 FS2828 1500MM 9 10 11 12 13 14 Ridge Bar 28x28x1177mm QTY 1 FS2828 1177MM Cover Trims 12x45x1155mm QTY 2 S1245 1155MM Fascia Board 12x95x980mm QTY 4 FAS1295 G 980MM Eaves Frame 28x28x1520mm QTY 2 FS2828 1520MM 20 17 Ply Door Stop QTY 1 PLY TRIANGLE 16 Wooden Door Handle QTY 1 PI 04 0024 19 18 T hinge QTY 2 PI 07 0113 L Bracket QTY 2 PI 07 0012 Windo...

Page 4: ...crew x 32 Felt Tacks x 60 30mm Black Screw x 14 Nail Bag There may be extra screws present in the nail bag 20mm Screw x 7 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PL...

Page 5: ... Spread them evenly making sure the end board is flush with the framing Fix using 2 x 30mm screws for each board along the dotted lines shown on the illustration 50x30mm screws 30mm screw 6 10 9 6 10 9 1 2 Pre drill hole Step 3 Parts needed Position the Plain Gable No 4 and Plain Side Left No 2 so there is equal spacing between the floor and cladding on all 4 sides Fix the corners with 50mm screws...

Page 6: ...roof sheet at the top Make sure to attach the roofs to the ridge bar 6x30mm screws 24x40mm screws 40mm screw 30mm screw 5 5 14 1 2 Pre drill hole 14 5 Step 7 Parts needed Fit the Fascia Block No 15 to the front of the building using 4x30mm screws make sure it is flush with the outside edge of each roof OSB sheet No 5 4x30mm screws 30mm screw 1 2 Pre drill hole 15 15 1 2 Pre drill hole Step 8 Once ...

Page 7: ...x Felt Tacks HANDLE WITH CARE 1 2 3 4 1 2 3 21 2 21 12 Step 10 Parts needed At the back of the building fix the two Cover Trims No 12 to either end of the side panels where the panels join Use 3x30mm screws per trim 6x30mm screws 30mm screw 1 2 Pre drill hole 12 12 Step 11 Parts needed Locate the Fascias No 13 on to the front and back of the playhouse ensuring to trap the felt between the fascia a...

Page 8: ... of the door Keeping the screws to one side With the top rail of the door removed peel off the film from both sides of the styrene Slide the door cross No 24 into the door channel along side the styrene Place the door top rail back on top of the door and fix in place using the screws previously removed 7 24 1 2 Pre drill hole 24 7 Please retain product label and instructions for future reference D...

Page 9: ...e drill hole 3 30mm screw 7 19 22 12mm 17 1 22 19 19 19 22 22 22 22 Step 15 Parts needed 20mm screw 1 2 Pre drill hole 17 16 A B A B Locate the Wooden Door Handle No 16 onto the outside of the door Fix in place by hand screwing through the door with the screw attached to the door handle On the inside of the door opening fix the Ply Door Stop No 17 to the bottom left corner using 3x20mm screws 3x20...

Page 10: ...son Check all nuts bolts screws for tightness and tighten when required Check for movement opening of wood giving rise to protrusion of nail heads and tips Check hinges Replace defective parts in accordance with the manufacturers instructions Check any crossbeams suspensions and anchors If a swing is included check the swing seat chains and ropes IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TO...

Page 11: ... 2 1 3 4 ...

Page 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2 ...

Reviews: