Step 14

Parts needed -             &            & 

 

Position the Door (

No.7)

 within the door opening of 

the Door Gable (

No.1) 

with equal spacing top and 

bottom. 

Position two Door Spacer Strips 

(No.22)

 down each 

side of the Door (

No.7) 

to ensure equal spacing.

Place the Hinges 

(No.19)

 at the top and bottom of 

the Door (

No.7)

, using 7x30mm black screws per 

hinge, fix the hinge to the door and the door gable.

14x30mm Black screws

.

1!

2!

Pre drill 

hole

3!

30mm 

screw

7

19

22

12mm

17

1

22

19

19

19

22

22

22

22

Step 15

Parts needed -             & 

20mm 

screw

1!

2!

Pre drill 

hole

17

16

A

B

A

B

Locate the Wooden Door Handle (

No.16

) onto 

the outside of the door. Fix in place by hand, 

screwing through the door with the screw 

attached to the door handle. 

On the inside of the door opening, fix the Ply 

Door Stop 

(

No.17

)

 to the bottom left  corner 

using 3x20mm screws.

3x20mm screws.

16

17

P 9

Please retain product label and instructions for future reference

       

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk

Please retain product label and instructions for future reference

             

Summary of Contents for SI-002-001-0022

Page 1: ...r any hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller than the external measurement of the building i e The cladding should overlap the base creating a run off for water It is also recommended that the floor be at least 25mm above the su...

Page 2: ...I 002 001 0023 5x5 Playhouse With Half Glazed Door Tower Slide SI 002 001 0024 5x5 Playhouse With Half Glazed Door Tower Slide Swing SI 002 001 0025 Model Build Instructions Required 02DTSHAX0505HGD1W V1 PEFC Playhouse 02DTSHAX0505HGD1W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 02DTSHAX0505HGD1W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 02PATINCSWA V1 PEFC Swing Set 02DTSHAX0505HGD1W V1 PEFC P...

Page 3: ... QTY 1 PI 03 0009 Floor Joist 28x28x1500mm QTY 5 FS2828 1500MM 9 10 11 12 13 14 Ridge Bar 28x28x1177mm QTY 1 FS2828 1177MM Cover Trims 12x45x1155mm QTY 2 S1245 1155MM Fascia Board 12x95x980mm QTY 4 FAS1295 G 980MM Eaves Frame 28x28x1520mm QTY 2 FS2828 1520MM 20 17 Ply Door Stop QTY 1 PLY TRIANGLE 16 Wooden Door Handle QTY 1 PI 04 0024 19 18 T hinge QTY 2 PI 07 0113 L Bracket QTY 2 PI 07 0012 Windo...

Page 4: ...crew x 32 Felt Tacks x 60 30mm Black Screw x 14 Nail Bag There may be extra screws present in the nail bag 20mm Screw x 7 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PL...

Page 5: ... Spread them evenly making sure the end board is flush with the framing Fix using 2 x 30mm screws for each board along the dotted lines shown on the illustration 50x30mm screws 30mm screw 6 10 9 6 10 9 1 2 Pre drill hole Step 3 Parts needed Position the Plain Gable No 4 and Plain Side Left No 2 so there is equal spacing between the floor and cladding on all 4 sides Fix the corners with 50mm screws...

Page 6: ...roof sheet at the top Make sure to attach the roofs to the ridge bar 6x30mm screws 24x40mm screws 40mm screw 30mm screw 5 5 14 1 2 Pre drill hole 14 5 Step 7 Parts needed Fit the Fascia Block No 15 to the front of the building using 4x30mm screws make sure it is flush with the outside edge of each roof OSB sheet No 5 4x30mm screws 30mm screw 1 2 Pre drill hole 15 15 1 2 Pre drill hole Step 8 Once ...

Page 7: ...x Felt Tacks HANDLE WITH CARE 1 2 3 4 1 2 3 21 2 21 12 Step 10 Parts needed At the back of the building fix the two Cover Trims No 12 to either end of the side panels where the panels join Use 3x30mm screws per trim 6x30mm screws 30mm screw 1 2 Pre drill hole 12 12 Step 11 Parts needed Locate the Fascias No 13 on to the front and back of the playhouse ensuring to trap the felt between the fascia a...

Page 8: ... of the door Keeping the screws to one side With the top rail of the door removed peel off the film from both sides of the styrene Slide the door cross No 24 into the door channel along side the styrene Place the door top rail back on top of the door and fix in place using the screws previously removed 7 24 1 2 Pre drill hole 24 7 Please retain product label and instructions for future reference D...

Page 9: ...e drill hole 3 30mm screw 7 19 22 12mm 17 1 22 19 19 19 22 22 22 22 Step 15 Parts needed 20mm screw 1 2 Pre drill hole 17 16 A B A B Locate the Wooden Door Handle No 16 onto the outside of the door Fix in place by hand screwing through the door with the screw attached to the door handle On the inside of the door opening fix the Ply Door Stop No 17 to the bottom left corner using 3x20mm screws 3x20...

Page 10: ...son Check all nuts bolts screws for tightness and tighten when required Check for movement opening of wood giving rise to protrusion of nail heads and tips Check hinges Replace defective parts in accordance with the manufacturers instructions Check any crossbeams suspensions and anchors If a swing is included check the swing seat chains and ropes IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TO...

Page 11: ... 2 1 3 4 ...

Page 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2 ...

Reviews: