background image

Please retain product label and instructions for future reference

           

Step 5

Parts needed -              & 

Place the Ridge Bar 

(No. 11)

 in between  

the Door Gable 

(No. 1) 

and Plain Gable 

(No. 4)

. Ensure the top  corners of the 

Ridge Bar 

(No. 11) 

are flush with  each 

top point (see illustration). 

Secure in place using a L bracket 

(No.18)

 on each end and 4x30mm 

screws per brace.

8x30mm screws

 

30mm 

screw

18

18

18

11

1!

2!

Pre drill 

hole

11

Step 6

Parts needed -             &

Fix an Eaves Frame 

(No. 14)

 to each 

roof OSB sheet using 3x30mm screws 

per eave.

Fix the Roof sheets 

(No. 5)

 to the roof  

ensuring they come together at the 

top using 12x40mm screws per sheet, 

directly through the roof sheet at the 

top. Make sure to attach the roofs to 

the ridge bar. 

6x30mm screws

24x40mm screws

40mm 

screw

30mm 

screw

5

5

14

1!

2!

Pre drill 

hole

14

5

Step 7

Parts needed -       

Fit the Fascia Block 

(No. 15)

 to the front of 

the building using 4x30mm screws, make 

sure it is flush with the outside edge of 

each roof OSB sheet 

(No. 5)

.

4x30mm screws

30mm 

screw

1!

2!

Pre drill 

hole

15

15

1!

2!

Pre drill 

hole

Step 8

      

Once the roof 

(No.5

) is fixed, secure the 

building to the Floor 

(No.6) 

using 

5x50mm screws per panel, making sure 

to screw into the Floor bearers.

20x50mm screws

50mm 

screw

b

b

b

b

b

b

b

b

b

b

b

Please retain product label and instructions for future reference

             

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY 

COMPONENT PARTS PRIOR  TO ASSEMBLY.

www.merciagardenproducts.co.uk      P6

Summary of Contents for SI-002-001-0022

Page 1: ...r any hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slightly smaller than the external measurement of the building i e The cladding should overlap the base creating a run off for water It is also recommended that the floor be at least 25mm above the su...

Page 2: ...I 002 001 0023 5x5 Playhouse With Half Glazed Door Tower Slide SI 002 001 0024 5x5 Playhouse With Half Glazed Door Tower Slide Swing SI 002 001 0025 Model Build Instructions Required 02DTSHAX0505HGD1W V1 PEFC Playhouse 02DTSHAX0505HGD1W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 02DTSHAX0505HGD1W V1 PEFC Playhouse 02DTTWR6565 V1 PEFC Tower 02PATINCSWA V1 PEFC Swing Set 02DTSHAX0505HGD1W V1 PEFC P...

Page 3: ... QTY 1 PI 03 0009 Floor Joist 28x28x1500mm QTY 5 FS2828 1500MM 9 10 11 12 13 14 Ridge Bar 28x28x1177mm QTY 1 FS2828 1177MM Cover Trims 12x45x1155mm QTY 2 S1245 1155MM Fascia Board 12x95x980mm QTY 4 FAS1295 G 980MM Eaves Frame 28x28x1520mm QTY 2 FS2828 1520MM 20 17 Ply Door Stop QTY 1 PLY TRIANGLE 16 Wooden Door Handle QTY 1 PI 04 0024 19 18 T hinge QTY 2 PI 07 0113 L Bracket QTY 2 PI 07 0012 Windo...

Page 4: ...crew x 32 Felt Tacks x 60 30mm Black Screw x 14 Nail Bag There may be extra screws present in the nail bag 20mm Screw x 7 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver and hammer Dispose of the blocks once removed REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PL...

Page 5: ... Spread them evenly making sure the end board is flush with the framing Fix using 2 x 30mm screws for each board along the dotted lines shown on the illustration 50x30mm screws 30mm screw 6 10 9 6 10 9 1 2 Pre drill hole Step 3 Parts needed Position the Plain Gable No 4 and Plain Side Left No 2 so there is equal spacing between the floor and cladding on all 4 sides Fix the corners with 50mm screws...

Page 6: ...roof sheet at the top Make sure to attach the roofs to the ridge bar 6x30mm screws 24x40mm screws 40mm screw 30mm screw 5 5 14 1 2 Pre drill hole 14 5 Step 7 Parts needed Fit the Fascia Block No 15 to the front of the building using 4x30mm screws make sure it is flush with the outside edge of each roof OSB sheet No 5 4x30mm screws 30mm screw 1 2 Pre drill hole 15 15 1 2 Pre drill hole Step 8 Once ...

Page 7: ...x Felt Tacks HANDLE WITH CARE 1 2 3 4 1 2 3 21 2 21 12 Step 10 Parts needed At the back of the building fix the two Cover Trims No 12 to either end of the side panels where the panels join Use 3x30mm screws per trim 6x30mm screws 30mm screw 1 2 Pre drill hole 12 12 Step 11 Parts needed Locate the Fascias No 13 on to the front and back of the playhouse ensuring to trap the felt between the fascia a...

Page 8: ... of the door Keeping the screws to one side With the top rail of the door removed peel off the film from both sides of the styrene Slide the door cross No 24 into the door channel along side the styrene Place the door top rail back on top of the door and fix in place using the screws previously removed 7 24 1 2 Pre drill hole 24 7 Please retain product label and instructions for future reference D...

Page 9: ...e drill hole 3 30mm screw 7 19 22 12mm 17 1 22 19 19 19 22 22 22 22 Step 15 Parts needed 20mm screw 1 2 Pre drill hole 17 16 A B A B Locate the Wooden Door Handle No 16 onto the outside of the door Fix in place by hand screwing through the door with the screw attached to the door handle On the inside of the door opening fix the Ply Door Stop No 17 to the bottom left corner using 3x20mm screws 3x20...

Page 10: ...son Check all nuts bolts screws for tightness and tighten when required Check for movement opening of wood giving rise to protrusion of nail heads and tips Check hinges Replace defective parts in accordance with the manufacturers instructions Check any crossbeams suspensions and anchors If a swing is included check the swing seat chains and ropes IF THESE CHECKS ARE NOT CARRIED OUT THE ACTIVITY TO...

Page 11: ... 2 1 3 4 ...

Page 12: ...REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE 1 2 ...

Reviews: