ROOF TRIM & SILICONE FINISH
Apply the small trims at the front and back first.
Ensure the trims are flush end to end and they are
in contact with the roof as much as possible. Use 5
x 30mm nails.
239
239
Apply the roof trims on each side, in between the
front and back. Ensure these are flush end to end
and follow the angle of the roof from front to back.
240
240
Start at the top and trail down to the ledge at the
bottom. Keep the amount of silicone consistent as
you trail down.
244
244
246
246
You will be provided a silicone seal for the
windows and doors. The colour provided will
match your windows and doors.
243
243
Use 5 x 30mm nails for the roof trims on each
side. The final result from the back.
241
241
The above picture shows the final result of the
windows and door.
242
242
Repeat the same process on the opposite side.
245
245
Finish with trailing across the top. Repeat the same
process around the window frame.
After your Xtend Garden Building has been assembled you will need to apply a preservative. Please refer to the
Xtend Garden Building Aftercare Information.
37