CLEANING & SEALING (WINDOW & DOOR)
Apply silicone and stick the packers at diagonal
opposing corners. Place the pane into position,
ensuring it is centralised and packed correctly,
holding the pane square.
175
175
DOOR GLAZING & FRAME FINISHES
As the pane is positioned, the beading can be
installed using a nylon mallet and tapped securely
back into place.
176
176
Apply expanding foam around the outer edge of
the window frame.
180
180
The expanding foam will be tack free in about 20
minutes. It can be cut back after twelve hours and
will be fully cured in 12 -24 hours.
182
182
Repeat the same process for the internal strip.
179
179
Repeat the same process for the other door and
window panes, ensuring it is centralised and
packed properly with the toe and heel process.
Then add the window handle inside.
177
177
For the adjoining frames, attach the strip provided
with the metal capping. This will clip into the fixed
metal capping. To further secure, you can also add
glue to the strip.
178
178
Repeat the application of the expanding foam
around the front window and door frame.
181
181
Need some extra help with the window and door sections? Access our ‘how to’ video on our website at forestgarden.co.uk
29