EXTERNAL T&G CLADDING & FASCIA’S
Apply the front panel (BE). Ensure it is butted
up against the side panel and flush to the door
section. Use 6 x 80mm screws per panel. Ensure
you use 3 x 80mm screws down each side of the
cladded panel.
111
111
Repeat the same process as the lintel for the kick
plate panel (BF) that goes underneath the door
opening.
115
115
Using 2 x 80mm screws, secure the side fascia.
Ensure this is flush to the top and front, whilst
butting up against the T&G side panel. Repeat this
process for the other side.
117
117
Apply the lintel panel (BG). This will fit in between
the front panels. Use 6 x 80mm screws. Make sure
to drill through the battens beneath.
114
114
Use 3 x 80mm screws for the other edge of the
side panel (BC) and screw into the front panel (BE)
batten to secure together.
112
112
Repeat the process for the other front panel (BE).
113
113
Position the front fascia. Ensure it is flush to the
top and to the side fascia’s outer face. Use 3 x
80mm screws centrally across the fascia. Repeat
this process for the other front fascia.
118
118
Apply the canopy panels (BD) one at a time.
Ensure they are flush to all edges. Apply 6 x 80mm
screws per panel.
116
116
21