EXTERNAL T&G CLADDING
Continue onto the side panels (BB). Knock the first
panel in place and ensure it is butted up against
the back panel overhang.
103
103
Using 3 x 80mm screws, screw the one side into
place.
107
107
Repeat the same process on the opposite side (BB
& BH). Start at the back and butt up against the
back panels T&G board. Screw into place.
109
109
Apply the next side panels (BH & BA). Softly knock
the second side panel (BH) into the first, so the
T&G interlocks the panels together. Use a rubber
mallet for a softer application. Repeat the same
process for the (BA) T&G panel.
106
106
Use 6 x 80mm screws per panel. Ensure you use
3 x 80mm screws down each side of the cladded
panel.
104
104
Ensure the cladded panels are 45mm off the
ground. If you are using the batten as a guide,
slightly lift up the secured panel to ensure it is
carefully removed to prevent any damage.
105
105
Ensure the opening of the cladding is flush around
all edges to the window opening provided (BC). If
not aligned properly, this will cause issues during
the window installation.
110
110
The batten and the T&G board will overhang at
the front, as indicated on the layout shown above.
Pre-drill ready, as these 3 x 80mm screws will go
into the front panel.
108
108
20