![background image](http://html.mh-extra.com/html/fendt/916-vario/916-vario_operating-manual_552662054.webp)
54
OPERATION
Selecting PTO speed
Operation_Pic_number:1
●
Select the desired PTO speed with one of the
following buttons.
NOTE:
As long the LED next to the selected key is
blinking, the changeover is still taking place
or the PTO is still operating. PTO cannot be
engaged.
If the LED next to the button pressed is lit, the
PTO speed is switched on. The PTO can now
be engaged.
NOTE:
At transmission temperatures below -10
°
C.
- first switch PTO speed to Neutral, wait for
5 seconds, then select a new PTO speed.
- after selecting PTO speed, wait for 5 se-
conds, then engage the PTO.
PTO 540
Economy PTO (750)
PTO 1000
PTO neutral
Fig.92
10.2 Engaging and disengaging
rear PTO
Operation_Pic_number:1
NOTE:
If no PTO speed has been selected when en-
gaging the PTO, the PTO disengages after a
few seconds and a warning message is dis-
played on the multiple display (see FAULTS
AND REMEDIAL ACTIONS Section 1.1).
When changing PTO speeds, always shift to
neutral first, then select the desired PTO
speed.
For implements that require high initial
power, disengage the rear PTO with pushbut-
ton (A) (see OPERATION Fig. 98).
DANGER:
Before engaging PTO, make sure
no-one remains in the implement’s
hazard zone.
The selected PTO speed must be in
accordance the permitted implement
speed.
The rear PTO can be
engaged/disengaged using the button
(A).
When the PTO is engaged, the LED beside the
button is lit.
The coupling process depends on the length of
time the button is pressed:
Less than 5 sec.
Smooth start, PTO clutch adapts automatically
to the requirements of the implement.
More than 5 sec.
Speed and electronic monitoring are bypassed.
Fig.93
Summary of Contents for 916 Vario
Page 8: ...8 NUMERICAL INDEX ...
Page 172: ...172 CARE AND MAINTENANCE ETWiring diagram 22 3 Power supply UB 930 900 000 004 Sheet 2 ...
Page 173: ...173 CARE AND MAINTENANCE ETWiring diagram 22 4 Grounding layout 930 900 000 004 Sheet 3 ...
Page 174: ...174 CARE AND MAINTENANCE ETWiring diagram 22 5 Starter control 930 900 000 004 Sheet 4 ...
Page 175: ...175 CARE AND MAINTENANCE ETWiring diagram 22 6 Cold start system 930 900 000 004 Sheet 5 ...
Page 177: ...177 CARE AND MAINTENANCE ETWiring diagram 22 8 STVZO lighting Sheet 1 930 900 000 004 Sheet 7 ...
Page 179: ...179 CARE AND MAINTENANCE ETWiring diagram 22 10 Turn signal system 930 900 000 004 Sheet 9 ...
Page 183: ...183 CARE AND MAINTENANCE ETWiring diagram 22 14 Rear work lamps 930 900 000 004 Sheet 13 ...
Page 186: ...186 CARE AND MAINTENANCE ETWiring diagram 22 17 Heater 930 900 000 004 Sheet 16 ...
Page 191: ...191 CARE AND MAINTENANCE ETWiring diagram 22 22 Comfort bus K bus 930 900 000 004 Sheet 21 ...
Page 192: ...192 CARE AND MAINTENANCE ETWiring diagram 22 23 Instrument panel 930 900 000 004 Sheet 22 ...
Page 197: ...197 CARE AND MAINTENANCE ETWiring diagram 22 28 Transmission control 930 900 000 004 Sheet 27 ...
Page 199: ...199 CARE AND MAINTENANCE ETWiring diagram 22 30 Suspension 930 900 000 004 Sheet 29 ...
Page 200: ...200 CARE AND MAINTENANCE ETWiring diagram 22 31 PTO 930 900 000 004 Sheet 30 ...
Page 202: ...202 CARE AND MAINTENANCE ETWiring diagram 22 33 LBS 930 900 000 004 Sheet 32 ...
Page 203: ...203 CARE AND MAINTENANCE ETWiring diagram 22 34 Engine control 930 900 000 004 Sheet 33 ...
Page 262: ...262 TECHNICAL DATA ...
Page 266: ...266 ALPHABETICAL INDEX ...