OPERATION
24. Track adjustment
24.1 Lighting wide vehicle
Operation_Pic_number:1
Apply left and right warning signs flush with the
outer edge of the tyre.
Tighten locking screw (A) at 5 Nm.
DANGER:
When working on tyres, make sure
the tractor is properly parked and
secured against rolling away (wheel
chocks)!
If the engine needs to be started for
turning the wheels, both wheels
must be jacked up and turn free.
When the tractor is jacked up and
some one is working underneath, no
one else should be on the tractor.
If the tractor is lifted with the lower
links, additional supports are
required!
Tyre repairs should be performed
only by qualified personnel using
suitable tools.
Tyres may explode if the air pressure
is too high! Check tyre pressures
regularly!
Do not use special protective tyres
for heavy-duty traction work or front
loader operations; maximum road
speed 25 km/h.
After wheel mounting or track
adjustment, tighten the bolts and
nuts on front and rear wheels and on
track adjusting elements. Check
these regularly!
Fig.258
24.2 Rear axle stub
Text-module
(optional).
Change track width
Operation_Pic_number:1
Jack up rear wheels, loosen screws (A).
Screw in the screws (in tool box) in hole (B) to
loosen the chuck cone.
Set to the desired track width.
Operation_Pic_number:1
If the track width is changed, the mounting bolts
should be tightened in accordance with the
following diagram.
1
= Tighten hexagon screws in the order
shown (1-6) at a torque of 200 Nm.
2
= Tighten hexagon bolts to Nm in the order
shown (1-6).
3
= Drive tractor for a couple of hundred
yards then retighten to 600 Nm in the or-
der shown (1-6).
4
= After another 3 operating hours, re-
tighten in the order shown (1-6), to
600 Nm.
5
= After 10 additional operating hours re-
tighten according to the shown pattern
(1-6) at 600 Nm.
Fig.259
Fig.260
Summary of Contents for 916 Vario
Page 8: ...8 NUMERICAL INDEX ...
Page 172: ...172 CARE AND MAINTENANCE ETWiring diagram 22 3 Power supply UB 930 900 000 004 Sheet 2 ...
Page 173: ...173 CARE AND MAINTENANCE ETWiring diagram 22 4 Grounding layout 930 900 000 004 Sheet 3 ...
Page 174: ...174 CARE AND MAINTENANCE ETWiring diagram 22 5 Starter control 930 900 000 004 Sheet 4 ...
Page 175: ...175 CARE AND MAINTENANCE ETWiring diagram 22 6 Cold start system 930 900 000 004 Sheet 5 ...
Page 177: ...177 CARE AND MAINTENANCE ETWiring diagram 22 8 STVZO lighting Sheet 1 930 900 000 004 Sheet 7 ...
Page 179: ...179 CARE AND MAINTENANCE ETWiring diagram 22 10 Turn signal system 930 900 000 004 Sheet 9 ...
Page 183: ...183 CARE AND MAINTENANCE ETWiring diagram 22 14 Rear work lamps 930 900 000 004 Sheet 13 ...
Page 186: ...186 CARE AND MAINTENANCE ETWiring diagram 22 17 Heater 930 900 000 004 Sheet 16 ...
Page 191: ...191 CARE AND MAINTENANCE ETWiring diagram 22 22 Comfort bus K bus 930 900 000 004 Sheet 21 ...
Page 192: ...192 CARE AND MAINTENANCE ETWiring diagram 22 23 Instrument panel 930 900 000 004 Sheet 22 ...
Page 197: ...197 CARE AND MAINTENANCE ETWiring diagram 22 28 Transmission control 930 900 000 004 Sheet 27 ...
Page 199: ...199 CARE AND MAINTENANCE ETWiring diagram 22 30 Suspension 930 900 000 004 Sheet 29 ...
Page 200: ...200 CARE AND MAINTENANCE ETWiring diagram 22 31 PTO 930 900 000 004 Sheet 30 ...
Page 202: ...202 CARE AND MAINTENANCE ETWiring diagram 22 33 LBS 930 900 000 004 Sheet 32 ...
Page 203: ...203 CARE AND MAINTENANCE ETWiring diagram 22 34 Engine control 930 900 000 004 Sheet 33 ...
Page 262: ...262 TECHNICAL DATA ...
Page 266: ...266 ALPHABETICAL INDEX ...