86
OPERATION
Releasing the side lock.
cat. II.
= Put peg into hole (A).
cat. III.
= Put peg into hole (B).
Fine adjustments of the lateral stabilisers are ob-
tained by screwing the threaded bolts in or out
(C).
Text-module
Checking:
●
Before raising the hitched implement, it must
be possible to lock both lateral supports free
of play.
IMPORTANT:
Lower links automatically become rigid late-
rally, when the lifting arm is raised. Too tight
a setting will result in clamping in the three-
point linkage.
Height-adjustable lower links
Operation_Pic_number:1
●
Insert bolt in lower hole (A).
Required for implements with outrigger wheels
and without swing compensation, e.g. for plan-
ting machines.
Lower link hook locking
Operation_Pic_number:1
Under particularly heavy operating conditions,
secure the lower link hooks against unintentional
release (e.g. for logging work).
●
Insert bolts (e.g. M 8x50) in the holes (arro-
wed) and secure with nuts.
Fig.188
Fig.189
19.2 Extendable lifting struts
Operation_Pic_number:1
The lifting struts are extendable.
●
Fold up the securing clamp (A).
●
Adjust the lifting struts by turning handle (B).
NOTE:
It must still be possible for the securing
clamp (A) to be folded over button (B).
Operation_Pic_number:1
Maximum length is reached when the mark
(arrowed) is visible.
Fig.190
Fig.191
Summary of Contents for 916 Vario
Page 8: ...8 NUMERICAL INDEX ...
Page 172: ...172 CARE AND MAINTENANCE ETWiring diagram 22 3 Power supply UB 930 900 000 004 Sheet 2 ...
Page 173: ...173 CARE AND MAINTENANCE ETWiring diagram 22 4 Grounding layout 930 900 000 004 Sheet 3 ...
Page 174: ...174 CARE AND MAINTENANCE ETWiring diagram 22 5 Starter control 930 900 000 004 Sheet 4 ...
Page 175: ...175 CARE AND MAINTENANCE ETWiring diagram 22 6 Cold start system 930 900 000 004 Sheet 5 ...
Page 177: ...177 CARE AND MAINTENANCE ETWiring diagram 22 8 STVZO lighting Sheet 1 930 900 000 004 Sheet 7 ...
Page 179: ...179 CARE AND MAINTENANCE ETWiring diagram 22 10 Turn signal system 930 900 000 004 Sheet 9 ...
Page 183: ...183 CARE AND MAINTENANCE ETWiring diagram 22 14 Rear work lamps 930 900 000 004 Sheet 13 ...
Page 186: ...186 CARE AND MAINTENANCE ETWiring diagram 22 17 Heater 930 900 000 004 Sheet 16 ...
Page 191: ...191 CARE AND MAINTENANCE ETWiring diagram 22 22 Comfort bus K bus 930 900 000 004 Sheet 21 ...
Page 192: ...192 CARE AND MAINTENANCE ETWiring diagram 22 23 Instrument panel 930 900 000 004 Sheet 22 ...
Page 197: ...197 CARE AND MAINTENANCE ETWiring diagram 22 28 Transmission control 930 900 000 004 Sheet 27 ...
Page 199: ...199 CARE AND MAINTENANCE ETWiring diagram 22 30 Suspension 930 900 000 004 Sheet 29 ...
Page 200: ...200 CARE AND MAINTENANCE ETWiring diagram 22 31 PTO 930 900 000 004 Sheet 30 ...
Page 202: ...202 CARE AND MAINTENANCE ETWiring diagram 22 33 LBS 930 900 000 004 Sheet 32 ...
Page 203: ...203 CARE AND MAINTENANCE ETWiring diagram 22 34 Engine control 930 900 000 004 Sheet 33 ...
Page 262: ...262 TECHNICAL DATA ...
Page 266: ...266 ALPHABETICAL INDEX ...