![background image](http://html.mh-extra.com/html/fendt/916-vario/916-vario_operating-manual_552662122.webp)
122
OPERATION
29.2 Loading the implement
software for implement control
Text-module
Ignition OFF. Connect the mounted implement to
the tractor using the LBS socket.
Ignition ON.
The following menu quickly appears in the con-
trol terminal.
Operation_Pic_number:1
After approx. 30 seconds, download will be
initiated automatically.
The F1 key can be used to start the loading
process immediately.
The ESC key can be used to abort the loading
process.
Text-module
Once the downloading process has started, the
following menu appears in the control terminal.
Operation_Pic_number:1
Indicator bar (A) Red: progress of memory
erasing.
Bar indicator (A) Green: progress of data
transfer from the implement to the operating
terminal.
If downloading has been successful, the
following image appears.
Fig.297
Fig.298
Operation_Pic_number:1
If downloading has been successful, the
following image appears (A).
Operation_Pic_number:1
NOTE:
Up to four working implements can be stored.
If the data memory is full, the data for the im-
plement not used for the longest time are de-
leted.
If the loading process is not successful, the
following menu appears on the control terminal.
Operation_Pic_number:1
Press key F1 to re-start the loading process.
Press key ESC to abort the loading process.
Fig.299
Fig.300
Fig.301
Summary of Contents for 916 Vario
Page 8: ...8 NUMERICAL INDEX ...
Page 172: ...172 CARE AND MAINTENANCE ETWiring diagram 22 3 Power supply UB 930 900 000 004 Sheet 2 ...
Page 173: ...173 CARE AND MAINTENANCE ETWiring diagram 22 4 Grounding layout 930 900 000 004 Sheet 3 ...
Page 174: ...174 CARE AND MAINTENANCE ETWiring diagram 22 5 Starter control 930 900 000 004 Sheet 4 ...
Page 175: ...175 CARE AND MAINTENANCE ETWiring diagram 22 6 Cold start system 930 900 000 004 Sheet 5 ...
Page 177: ...177 CARE AND MAINTENANCE ETWiring diagram 22 8 STVZO lighting Sheet 1 930 900 000 004 Sheet 7 ...
Page 179: ...179 CARE AND MAINTENANCE ETWiring diagram 22 10 Turn signal system 930 900 000 004 Sheet 9 ...
Page 183: ...183 CARE AND MAINTENANCE ETWiring diagram 22 14 Rear work lamps 930 900 000 004 Sheet 13 ...
Page 186: ...186 CARE AND MAINTENANCE ETWiring diagram 22 17 Heater 930 900 000 004 Sheet 16 ...
Page 191: ...191 CARE AND MAINTENANCE ETWiring diagram 22 22 Comfort bus K bus 930 900 000 004 Sheet 21 ...
Page 192: ...192 CARE AND MAINTENANCE ETWiring diagram 22 23 Instrument panel 930 900 000 004 Sheet 22 ...
Page 197: ...197 CARE AND MAINTENANCE ETWiring diagram 22 28 Transmission control 930 900 000 004 Sheet 27 ...
Page 199: ...199 CARE AND MAINTENANCE ETWiring diagram 22 30 Suspension 930 900 000 004 Sheet 29 ...
Page 200: ...200 CARE AND MAINTENANCE ETWiring diagram 22 31 PTO 930 900 000 004 Sheet 30 ...
Page 202: ...202 CARE AND MAINTENANCE ETWiring diagram 22 33 LBS 930 900 000 004 Sheet 32 ...
Page 203: ...203 CARE AND MAINTENANCE ETWiring diagram 22 34 Engine control 930 900 000 004 Sheet 33 ...
Page 262: ...262 TECHNICAL DATA ...
Page 266: ...266 ALPHABETICAL INDEX ...