18
J6
J12
J13
J11
J14
J7
+
-
F
Sw1 Sw2 Sw3
J15
J1
J2
J3
J4
M1
DL1 DL2
D
L10
D
L11
D
L12
D
L13
D
L14
D
L18
D
L17
D
L7
D
L5
D
L8
D
L6
D
L9
D
L16
D
L3
D
L4
DL15
2Ea
sy B
US
OPEN
CLOSE
FSW STOP
ALARM
GND
+24
1 2
3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 18 19 20 21
+24
+24
+24
+24
OUT1
OUT2
OUT3
Rel
ay NO
Rel
ay NC
GND
LAMP
LOOP 1
LOOP 2
BATTERY
ENCODER
DISP1
Fig. 4
ENGLISH
6.4 “Expert” default parameters
The following table contains the pre-defined settings that characterize
the various operation logics.
Step
.
A
A1
E
P
PA
Cn
Ca
C
0 1
Y
Y
N
N
Y
N
Y
N
02
N
N
N
Y
Y
Y
Y
Y
03
N
N
N
N
N
N
N
N
04
N
N
N
N
N
N
N
Y
05
N
N
Y
N
N
N
N
N
06
N
N
Y
N
N
N
N
N
07
N
N
N
N
N
N
N
N
08
N
N
N
N
N
N
N
N
09
N
N
N
N
N
N
N
N
10
N
N
N
N
N
N
N
Y
1 1
N
N
N
N
N
N
N
N
12
N
N
N
Y
Y
N
N
N
13
N
N
N
N
N
N
N
N
14
N
N
N
Y
Y
Y
Y
N
15
N
N
N
N
N
N
N
N
16
N
N
N
Y
Y
N
N
N
17
N
Y
N
N
N
N
N
N
18
N
Y
N
N
N
N
N
N
19
N
N
N
Y
Y
N
N
N
20
N
Y
N
Y
Y
Y
Y
N
2 1
N
Y
N
Y
Y
Y
Y
N
22
N
N
N
N
N
N
N
N
23
N
N
N
Y
Y
N
N
N
24
N
N
N
N
N
N
N
N
25
N
N
N
N
N
N
N
N
26
N
N
N
N
N
N
N
N
27
N
N
N
N
N
N
N
N
28
N
N
N
N
N
N
N
N
29
N
N
N
N
N
N
N
N
30
N
N
N
N
N
Y
Y
N
7. START-UP
7.1 Verifying the diagnostic LEDs
Before starting up the board, it is necessary to verify that the status
of the diagnostic LEDs corresponds to the logic. Said status must
coincide with the indications in Fig. 4, situation which reflects that of
an
automated system that is CLOSED and ready to open.
The FSW, STOP and ALARM LEDs are safety inputs with
NC contacts, therefore the related LEDs must be ON
when the automated system is at rest, and go off when
the device connected is engaged.
The OPEN and CLOSE inputs are NO contact inputs,
therefore the related LEDs must be OFF when the
automated system is at rest, and go on when the device
connected is active.
The BUS status must correspond to DL2 (green) on fixed
and DL1 (red) off. The BUS menu of the
Basic configuration must display the
indication shown to the side confirming
the fact that there are no engaged
photocells or active pulse generators.
7.2 Setup
Before being put into operation, the E680 board requires a setup
procedure during which the automated system determines the rotation
angle of the beam and consequently its travel. These measurements
allow correct management of motor decelerations and acceleration
ramps.
At first start-up the board will signal the need for a setup
cycle, by displaying a flashing
S0
.
For setup, proceed as follows:
•
Using the parameter “Mt” in Basic configuration mode, check that
the opening / closing movement corresponds to the pressed key
(+ / -); if not, go to the motor wiring and reverse the two conductors
L1 and L3, as shown in Fig. 14, Ref.
d
•
Place the automated system in closing position using the
parameter “Mt” in Basic configuration mode or using the release
device, as shown in paragraphs 6 and 7 on page 4.
•
Press and hold SW4 (“SETUP” programming key) until the
automated system begins a slow opening movement. On the
display
S1
will flash indicating the start of the procedure.
•
Once the maximum opening position is reached, the automated
system will stop automatically.
•
Next, the automated system will start the beam closing
movement. The display will flash the indication
S3
.
•
Once the closing position has been reached, the automated
system will stop automatically and the display will go back to
showing the indication of the current status of the automated
system (
00
- closed).
8. TESTING THE AUTOMATED SYSTEM
Once programming is completed, ensure that the system is operating
correctly.
Verify especially the correct regulation of the automated system power
and correct operation of the safety devices it is connected to and verify
that the automated system conforms to current safety standards.
Summary of Contents for B680H
Page 1: ...B680H ...
Page 2: ......
Page 4: ......
Page 151: ...27 a b c d e f g h Fig 17 L ...
Page 152: ...28 Fig 18 a b a b d Fig 19 c 1 2 Fig 20 ...
Page 153: ...29 a b Fig 21 d e f c ...
Page 156: ...32 Fig 31 a b c d e ...
Page 157: ...33 Fig 32 f g ...
Page 158: ......
Page 163: ...5 1 2 Fig 18 ...
Page 164: ......
Page 165: ......