DEPOLOX
®
5 E flow cell
Installation
4.
43
4.4.12
Filling electrode cleaning sand
The electrode cleaning sand (part no. W3T158743) is supplied in a plas
-
tic bottle, the cap of which serves as a measuring beaker.
Proceed as follows:
1
Close the shut-off ball valve on the sample water inlet.
2
On the pressurized version, close the shut-off ball valve on the sam
-
ple water outlet.
3
On the non-pressurized version, take out a plug or sensor from the
cell body cover.
4
On the pressurized version, remove the protection cap or sensor on
the cell body cover.
5
Fill half a cap from the plastic bottle with cleaning sand and pour it
into the cell body through a sensor mounting hole (approx. 1/3 cm³ of
cell sand).
6
Make sure that the opening and the thread are clean; if necessary
rinse with distilled water.
7
Insert the plug or a sensor in the cell body cover.
8
Open the shut-off ball valve at the sample water inlet.
9
On the pressurized version, open the shut-off ball valve on the sam
-
ple water outlet.
Summary of Contents for WALLACE & TIERNAN DEPOLOX 5 E 700 P Series
Page 1: ...WALLACE TIERNAN DEPOLOX 5 E FLOW CELL INSTRUCTION MANUAL...
Page 56: ...56 WT 050 810 040 DE IM 0519 Maintenance DEPOLOX 5 E flow cell 5...
Page 72: ...72 WT 050 810 040 DE IM 0519 Declarations and certificates DEPOLOX 5 E flow cell 7...
Page 76: ...76 WT 050 810 040 DE IM 0519 Declarations and certificates DEPOLOX 5 E flow cell 7...
Page 80: ...80 WT 050 810 040 DE IM 0519 Index DEPOLOX 5 E flow cell 8...