48
WT.050.810.040.DE.IM.0519
Installation
DEPOLOX
®
5 E flow cell
4.
4.6.2
Taking sensors out of operation
Please note
Please follow the appropriate instructions for the sensors!
For the pH or redox combined measuring and reference electrode, pro
-
ceed as follows:
1
Pull out or unscrew the sensors.
2
Fit the pH or redox combined measuring and reference electrode into
the KCl tank and stand with KCI solution.
3
Store the sensors in a frost-free place.
Image 18pH and redox combined measuring and reference electrode
with stand
A Sensor
B Sealing cap
C O-ring
D Tank
E Stand
4.7
Recommissioning
1
Prepare the sensors. See appropriate sensor instruction manual.
2
Fitting the sensors and connect the sensors with DFMe electronics
module. See chapter 4.4.14 “Fitting the sens (optional)” and chapter
4.4.13 “Connecting sensors with DFMe electronics module”.
3
Filling electrode-cleaning sand, see chapter 4.4.12 “Filling electrode
4
For recommissioning, see instruction manual “700 P electronics
module” or “700 M electronics module”.
E
D
A
B
C
Summary of Contents for WALLACE & TIERNAN DEPOLOX 5 E 700 P Series
Page 1: ...WALLACE TIERNAN DEPOLOX 5 E FLOW CELL INSTRUCTION MANUAL...
Page 56: ...56 WT 050 810 040 DE IM 0519 Maintenance DEPOLOX 5 E flow cell 5...
Page 72: ...72 WT 050 810 040 DE IM 0519 Declarations and certificates DEPOLOX 5 E flow cell 7...
Page 76: ...76 WT 050 810 040 DE IM 0519 Declarations and certificates DEPOLOX 5 E flow cell 7...
Page 80: ...80 WT 050 810 040 DE IM 0519 Index DEPOLOX 5 E flow cell 8...