36
PREP
ARING FOR OPERA
TION
Information
INFORMATION
INFORMATION
This page shows an overview of the distributor machine.
T
he Distributor’s Serial Number (SN) is given in the top left corner. Refer to this when contacting an Etnyre
Service representative.
A key of all paid-for factory options is given in the bottom right. Please refer to Appendix A (Page 93) to
relate abbreviations to options
The bottom header shows the application versions of the computer and displays. The Etnyre service depart-
ment phone number is also given.
Pump Meter:
The pump meter shows the amount of time the asphalt pump has been spun.
Figure 40 - Information Screen
Figure 41 - Pump Meter