1 - 30
Chapter 1 Troubleshooting
Epson AcuLaser C2900N
Revision B
Confidential
7
Checking after replacing the fuser unit
Replace the fuser unit. (Refer to RRP6.1.)
Warning: Start the operation after the fuser unit has
cooled down.
Does the error still occur when the power is turned OFF and
ON?
NOTE: After replacement, be sure to clear the life
counter value.
Go to step 8.
End of work.
8
Checking after the PWBA LVPS.
Replace the PWBA LVPS. (Refer to RRP8.5.)
Does the error still occur when the power is turned off and
on?
Replace the
PWBA MCU.
(Refer to RRP8.9.)
End of work.
Step
Check
Remedy
Yes
No
Summary of Contents for AcuLaser C2900N
Page 12: ...Confidential CHAPTER 1 Troubleshooting ...
Page 202: ...Confidential CHAPTER 2 Operation of Diagnostic ...
Page 253: ...Confidential CHAPTER 3 Removal and Replacement Procedures ...
Page 497: ...Confidential CHAPTER 4 Plug Jack P J Connector Locations ...
Page 508: ...Confidential CHAPTER 5 Parts List ...
Page 555: ...Confidential CHAPTER 6 Principles of Operation ...
Page 630: ...Confidential CHAPTER 7 Wiring Diagrams and Signal Information ...
Page 660: ...Confidential CHAPTER 8 Product Specifications ...
Page 674: ...8 13 Chapter 8 Product Specifications Epson AcuLaser C2900N Revision B Confidential ...