
Rev. B 2022/02
47
CyBio FeliX
Operation
7
Operation
7.1
Switching on (operational readiness)
1.
Check that power cord is correctly connected to the line power supply point .
2.
Check if the louver
1
is closed.
3.
Switch the power switch (on the right device side) to position "I"
(
4.
Observe operating status indicator (LED):
Red (flashing/on continuously): An internal error is signaled
(Error analysis
„LED flashing – red” on page 73
Green (on continuously): Completion of initialization - display of readiness for opera-
tion.
5.
Make sure that the PC is correctly connected to the device, switched on and the con-
trol software is called up.
Fig. 18:
Power switch
The unit is ready for operation (insert head if necessary) and it can be operated
by means of computer control.
1 Does not apply to the version without enclosure/louver (e.g. 30-5015-500-24).
Summary of Contents for Analytik Jena CyBio FeliX
Page 1: ...CyBio FeliX Operating instructions...
Page 3: ...Rev B 2022 02 III CyBio FeliX...
Page 4: ...IV Rev B 2022 02 CyBio FeliX...
Page 8: ...VIII Rev B 2022 02 CyBio FeliX...
Page 12: ...XII Rev B 2022 02 CyBio FeliX...
Page 14: ...XIV Rev B 2022 02 CyBio FeliX...
Page 24: ...10 Rev B 2022 02 Technical Specifications CyBio FeliX...
Page 38: ...20 Rev B 2022 02 Safety instructions CyBio FeliX...
Page 52: ...38 Rev B 2022 02 Technical description CyBio FeliX...
Page 56: ...42 Rev B 2022 02 Packing transport and storage CyBio FeliX...
Page 88: ...74 Rev B 2022 02 CyBio FeliX...
Page 98: ...84 Rev B 2022 02 Maintenance Care CyBio FeliX...
Page 100: ...86 Rev B 2022 02 Shutting Down CyBio FeliX...