91
Reference Manual
00809-0100-4772, Rev FA
March 2016
Removing the terminal block
1.
Turn off the electric power to the flowmeter.
2.
Unscrew the cover.
Figure 7-6. F
OUNDATION
Fieldbus Terminal Block Assembly
A. Cover
B. O-ring
C. Terminal block
D. Captive screws (3)
3.
Disconnect the wires from the field terminals. Be sure to secure them out of the
way.
4.
Loosen the captive screws.
5.
Pull outward on the block to remove it from the housing.
Installing the terminal block
1.
Align the terminal block over the captive screw holes in the terminal block side of
the electronics housing.
2.
Slowly press the terminal block into place. Do not force the block into the housing.
Check the screw alignment if it does not glide into place.
3.
Tighten the three captive screws to anchor the terminal block.
4.
Connect the wires to the appropriate field terminals.
5.
If you have the transient option (Option T1), reinstall the tighten the transient
ground screw.
6.
Screw on and tighten the cover.
C
B
A
D