S A F E T Y I N F O R M A T I O N
Overview
2-9317-372-00-0
Bravo™ 8105 Programming and Operations Guide
1-13
Section C:
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Lock-Out Tag-Out
Overview
Introduction
Be sure to perform Lock-Out Tag-Out steps before beginning maintenance,
installation, or upgrade procedures. Since lock-out tag-out procedures and
policies vary from company to company, the information here is provided as a
recommended guideline. Each company must establish their own specific policies
and procedures.
Safety
To minimize system down time and ensure staff safety, observe the following:
ATTENTION
If procedures must continue past the shift of the person who applied the lockout
device, ensure that an employee who is working the next shift applies their
lockout device and the previous person removes the initial lockout device.
In this Section
Refer to the following lock-out tag-out procedures:
Topic
See Page
Attach Facility Lock-Out Tag-Out Device
1 – 14
Attach Machine Lock-Out Tag-Out Device
1 – 15
Perform Required Task
1 – 16
Remove Lock-Out Tag Out Devices
1 – 17