OPERATION
NP-DK50-Nx4VRTM-AD-A-EN-4_03-2021
40
03/2021
Motors are on
RUN MODE
– all aggregates are switched
on
RUN HOURS: operating hours
TIME-TO-GO MN - time to the next
maintenance / service work (in hours).
Motors are switched off
PRESSURE: current working pressure
STANDBY MODE
– all aggregates are
switched off
RUN HOURS: operating hours
TIME-TO-GO MN - time to the next
maintenance / service work (in hours).
The pressure sensor monitors the pressure in the air tank. The pressure is shown on the display.
Check all air line connections and check for compressed air leaks. Remedy all
leaks that are identified.
Slowly open the outlet valve to the ON position. The compressor starts and runs until the pressure
in the entire compressed air system stabilises. The aggregates then gradually turn off at the
switching pressure.
Complete a record for the installation of the compressor assembly and commissioning (see the
Annex chapter).
Shutting down the compressor
Press the STOP button (18) to shut down the compressors.
15.1. Controller
– operation and alarms
The controller controls the aggregates, monitors their operation, analyses faults, reports alarms and
indicates when maintenance is required after defined intervals are met.
The controller assesses the ambient and internal temperature of the compressor, working pressure
and operating hours.
These values, alarms and service interval information are shown on the display. Temperatures
above the critical values are shown as alarms.
The control panel on the controller has four cursor buttons ▲, ▼, ►, ◄, ESC and OK buttons, and
four function buttons F1-F4, which trigger the following:
Summary of Contents for DK50 4x4VRT/M
Page 1: ...DK50 4x4VRT M DK50 6x4VRT M User manual...
Page 2: ......
Page 4: ...CONTENTS 5...
Page 11: ...PRODUCT DESCRIPTION 03 2021 11 NP DK50 Nx4VRTM AD A EN 4_03 2021 DK50 4x4VRTS M DK 50 6x4VRT M...
Page 15: ...PRODUCT DESCRIPTION 03 2021 15 NP DK50 Nx4VRTM AD A EN 4_03 2021 Fig 1 Compressor with dryer...
Page 36: ...INSTALLATION NP DK50 Nx4VRTM AD A EN 4_03 2021 36 03 2021 DK50 6x4VRT M DK50 6x4VRTS M...
Page 68: ...ANNEX NP DK50 Nx4VRTM AD A EN 4_03 2021 68 03 2021 ANNEX 21 MAPPING PARAMETERS...
Page 69: ...ANNEX 03 2021 69 NP DK50 Nx4VRTM AD A EN 4_03 2021...
Page 71: ......
Page 72: ......
Page 73: ......