3.
Inspection Process
This section gives an example of the typical main processes involved when performing an inspection
with the FloormapX system.
3.1
Pre-Inspection preparation
•
Ensure the FloormapX is using the latest version of SIMS GO data acquisition software.
•
Check that no component is damaged.
•
Check that the unit is functional and powers on correctly.
•
Check that user control mechanism works as designed.
•
Check that high/low mechanism on the scanning head works.
•
Check that the magnets move freely.
•
Check that the drive and steering motors work.
•
Fully charge all FloormapX batteries.
•
Ensure the FloormapX and accessories are packaged properly for transit.
3.2
Onsite FloormapX setup preparation
Before beginning a tank floor inspection using the FloormapX, we advise operators to follow the
recommended checklist:
1.
Unpack and assemble the FloormapX system.
2.
Check all the FloormapX cables are connected and secure before powering on the system.
3.
Check all cables are free and not pinched.
4.
Ensure the cover plate is attached and fixed in place.
5.
Ensure the scanning bridge high / low mechanism is free moving and locks in both the high and
the low position.
6.
Ensure all FloormapX batteries are fully charged before inspection begins.
7.
Always ensure the drive system is clean and maintained.
8.
Power on the FloormapX.
9.
Ensure the motorization emergency stop is disengaged.
3.3
FloormapX calibration preparation
Calibration Checklist
1.
Determine the thickness of the tank bottom plates and coating using ultrasonic testing (UT) or
other reliable and accurate method.
2.
Identify a suitable reference plate thickness to use for calibration.
3.
If the tank bottom has a coating or lining and the thickness is more than 0.5mm (20mils) it must
be simulated on the reference plate during calibration and entered into the SIMS GO data
acquisition software calibration routine.
Calibration Considerations
Please refer to section 4.5 Create Calibration of this user manual for calibration procedure on how to
correctly calibrate the FloormapX using the SIMS GO for a particular plate and coating thickness.
Summary of Contents for Floormap X
Page 1: ...User s Manual Floormap X MFL Array Tank Floor Inspection Solution...
Page 10: ...10 Chapter 1 Precautions and conventions...
Page 16: ...General Precautions and Conventions 16 1 5 EU Declaration of Conformity...
Page 19: ...19 Chapter 2 FloormapX System Overview...
Page 35: ...35 Chapter 3 Inspection Preparation Setup and Operation...
Page 43: ...43 Chapter 4 SIMS GO Data Acquisition Software...
Page 69: ...69 Chapter 5 SIMS PRO...