Troubleshooting and Maintenance
101
Packing the FloormapX mainframe
Before packing the FloormapX mainframe, first the scanning head must be disassembled from the
system. Refer to the previous section Packing the FloormapX scanning head before packing the
mainframe. To continue system disassembly and packing:
1.
Pack the spare batteries and accessories into their respective slots in the transit case foam of
the mainframe transit case.
2.
With the mainframe disconnected from the scanner head and batteries removed, lift the
mainframe into the transit case resting the repositioning wheels on the foam.
3.
Roll the mainframe to the far end of the case so that the reposition wheels butt into the corner
of the foam.
4.
Rest the mainframe down on the user control.
5.
Disconnect the mainframe to docking connector for the tablet.
6.
Loosen the tablet docking angle adjustor knob and fold the docking with tablet flat against the
front of the mainframe.
NOTE
The docking angle adjustor knob only needs to be turned a few times to disengage the locking
teeth. It is not necessary to remove it from the system completely.
7.
Retighten the docking angle adjustor knob.
8.
Disconnect the user control cable.
9.
Whilst supporting the top of the mainframe, remove the user control from the mainframe and
set aside.
10.
Lower the mainframe into the transit case.
11.
Fasten the buckles around the mainframe and tighten so it cannot move in transit.
12.
Insert the user control into the lid recess and fasten the Velcro buckle.
13.
Ensuring that all component and documentation are in the case, close the lid.
Figure 133: Mainframe transit case packing
14.
Fasten each of the external case clasps.
Summary of Contents for Floormap X
Page 1: ...User s Manual Floormap X MFL Array Tank Floor Inspection Solution...
Page 10: ...10 Chapter 1 Precautions and conventions...
Page 16: ...General Precautions and Conventions 16 1 5 EU Declaration of Conformity...
Page 19: ...19 Chapter 2 FloormapX System Overview...
Page 35: ...35 Chapter 3 Inspection Preparation Setup and Operation...
Page 43: ...43 Chapter 4 SIMS GO Data Acquisition Software...
Page 69: ...69 Chapter 5 SIMS PRO...