417101637_Lub-O-Mat
- 44 -
Rev. 03-07.12
8.
Maintenance
8.1
Service Notes
The
Lub-O-Mat
metering units have been tested and left the factory in perfectly safe
operating condition.
To maintain it in this condition and ensure safe operation, the user must observe the advice
and warnings contained in these operating instructions.
ATTENTION
As a basic precaution, ensure that the unit is not connected to the mains and is not under
pressure before undertaking any maintenance or repair work. An operational test should
be carried out after changing any parts.
CAUTION
Any maintenance work performed while the unit is live should be carried out only by
qualified personnel.
8.2
Maintenance
The following points in particular should be checked when carrying out maintenance work on
the
Lub-O-Mat
metering units:
•
Condition of the fresh water delivery line and the metering line
•
Furring and dirt deposits
•
Tight-sealing of all parts carrying water or conveyor track lubrication
•
Whether the required metering performance is being maintained
•
Operation of pump display elements
In the event of a fault, refer to chapter
Summary of Contents for 183042
Page 14: ...417101637_Lub O Mat 14 Rev 03 07 12 5 8 Stromlaufplan Abb 5 8...
Page 24: ...417101637_Lub O Mat 24 Rev 03 07 12 11 Konformit tserkl rung...
Page 37: ...417101637_Lub O Mat 37 Rev 03 07 12 5 8 Circuit diagram Fig 5 8...
Page 47: ...417101637_Lub O Mat 47 Rev 03 07 12 11 Declaration of conformity...
Page 60: ...417101637_Lub O Mat 60 Rev 03 07 12 5 8 Sch ma de circuit fIG 5 8...
Page 70: ...417101637_Lub O Mat 70 Rev 03 07 12 11 D claration de conformit...
Page 71: ......