APPENDIX 5 - Checklist
Before Installation:
A. Specified cables are used for installation.
A. Wiring connections are labeled and verified for correctness.
A. Earth connections continuity is verified.
After Installation:
A. Installation has been carried out as per instructions in the manual.
A. Connections are made as per local standard and guidelines or as per
instructions provided in the manual. Any deviation is recorded.
A. Products are mounted in appropriate location and at appropriate height.
A. All units have been checked for operation and communication intelligibility.
Configuration:
A. Only required access profiles / user logins have been activated.
A. PINS of activated profiles have been changed from default values.
A. All the units are provided useful names.
A. Any deviation from default configuration is duly documented.
CAutIon
IntErCHAnGInG dAtA And poWEr LInES on outStAtIon WILL dAmAGE
tHE outStAtIon.
Summary of Contents for VoCALL 16
Page 96: ...96 Installation and operation manual 25 13741 E January 2020 www eaton com 17 Log Viewer...
Page 103: ...103 Installation and operation manual 25 13741 E January 2020 www eaton com 18 Webserver...
Page 115: ...115 Installation and operation manual 25 13741 E January 2020 www eaton com Notes...