41
Mounting- and Operating Instruction Eaton LoadStar-S JSB
40071860396 March 2021 www.ceag.de
16.7. Table configure ACU settings (Login = Expert)
16.7. Table configure ACU settings (Login = Expert)
Ope-
rating
steps
Icon
Function
Entries
1
Icon Menu
Actuate
2
Icon Basic settings Actuate
3
Icon ACU settings
Actuate
4
Icon Relay settings Actuate
5
Icon Relay 1 – 4
and Summer.
Icon Default Values
Load
Icon DB-FUB
Select the event icon and assign it to
the relay / buzzer.
At Actuate is reset to factory setting.
Special configuration for Deutsche
Bahn
6
Icon Inputs Set-
tings
Actuate
7
The following
function can be
assigned to each
input:
Use the arrow icons to select a func-
tion.
- No Function
- Switch
- Switch inverted
- manual reset
- Confirm deep discharge
- FT-Start
- BT-Start
- BT/FT cancel
- Block device
- Switch off continuous light
- Switching on the ready light
- fan monitoring
- Ext. ISO Monitor
- Ext. Battery Monitor
- Ect. Monitor
- All Luminaires ON
- AE Szenario active
- AE disruption
- power outage UV