33
Mounting- and Operating Instruction Eaton LoadStar-S JSB
40071860396 March 2021 www.ceag.de
16.2. Data download table via PC software and USB stick
16.2. Data download table via PC software and USB stick
Operating
steps
Icon
Function
Entries
2
Icon USB
Actuate
3
Icon Copy Config from
USB
Actuate. The configuration is automatically loaded from
the USB stick.
Manual configuration via the HMI
16.3. Configure basic settings table (login = untrained specialist)
Ope-
rating
step
Icon
Function
Entries
1
Icon menu
Actuate
2
Icon basic settings Actuate
3
Icon
Charging/Battery
Settings
Actuate
4
Icon
BT End setup
Entries to the operating duration test
length, required time and conditions
when the BT is to be aborted.
5
Icon
Battery setup
Entries of the nominal capacity, num-
ber of battery blocks, cells per block
and the float charge voltage
6
Icon
General setup
Battery information such as type, order
number, etc.