31
Mounting- and Operating Instruction Eaton LoadStar-S JSB
40071860396 March 2021 www.ceag.de
16.1. Table Usergroup
Instructors
skilled worker
(Includes all legitimacy of
operator and untrained
professional plus advan-
ced configuration)
• Charging-/Battery Status
o Voltage in V, charge-discharge current in A,
capacity in %, ambient temperature battery set
in°C
o Last DT time
o Status Battery Block Monitoring (optional)
o Status Charging modules (CM)
o Software status
o String current (optional)
o Reset deep discharge
o Reset ISO-failure
• Circuit Status
• Luminaire Status
• IO/3PM-IP Status
• ACU Status
o Communication Status
o Relay Status
o Status Inputs
• PSU Status
• Group device state
o Total pup
o search devices
• Menu
o Get service information.
o Load and save device configuration via
USB
- Copy Config to USB
- Copy Config from USB
- Eject USB
- Select Firmware
- Copy Lum types from USB
• Start FT
• Functions
o Start Duration Test (DT)
o Cancel Functiontest/Duration Test
o Manual reset
o Search ISO failure
o Luminaire search (all modules)
o Learn current values (all Modules)
o deregister ext. modules
o Block device
o Release device
o Simulate mains failure
o FT short forward run
o All luminaires on
o non-maintained luminaires on
o maintained luminaires off
• Basic settings
o Charging/Battery Setting
o Test Settings
o General settings
- System Settings
-
Timer
Settings
-
HMI
Settings
• Log book
• Circuit Setup
• Luminaire setup
• I/O Modul Setup