2
Mounting- and Operating Instruction Eaton LoadStar-S JSB
40071860396 March 2021 www.ceag.de
Content
1 Important Notes ........................................................... 4
1.1 Symbol Key .................................................................. 4
1.2 Information on the Operating Manual.......................... 4
1.3 Applicable Documents ................................................. 4
1.4 Liability and Warranty ................................................... 4
1.5 Copyright ...................................................................... 4
1.6 Spare Parts ................................................................... 4
1.7 Disposal ....................................................................... 4
1.8 Safety ........................................................................... 5
1.9 Intended Use ............................................................... 5
1.10 Contents of the Operating Manual ............................ 5
1.11 Modifying and Retrofitting the Equipment ................. 5
1.12 Responsibility of the operator .................................... 5
1.13 Occupational Safety .................................................. 6
1.14 Personal Protective Equipment .................................. 6
2 Transportation, Packaging and Storage of batteries . 6
2.1 Safety Notes ............................................................... 6
2.2 Transport over land, enclosed lead battery blocks ....... 6
2.3 Transportation of enclosed lead batteries by sea ........ 6
2.4 Transportation of enclosed lead batteries by air .......... 6
2.5 Abbreviations ............................................................... 6
2.6 Transport Inspection .................................................... 7
2.7 Packaging ................................................................... 7
2.8 Requirements and Prep ............................................... 7
2.9 Storage Conditions ...................................................... 7
2.10 Storage ....................................................................... 7
2.11 Storage Time .............................................................. 7
3 Set up and Installation ................................................. 8
3.1 Battery rooms, ventilation and general requirements . 8
3.2 Temperature ................................................................. 8
3.3 Room dimensions and floor condition......................... 9
3.5 Ventilation requirements .............................................. 9
4 Preparations for battery installation ......................... 10
4.1 Mounting Battery Blocks and Battery Block Sensors 10
4.2 Battery sets in parallel installations ........................... 10
4.3 Mounting positions for AGM blocks ......................... 11
4.4 Operation ................................................................... 11
4.5 Maintenance .............................................................. 11
4.6 General and controls ................................................. 11
4.7 Disruptions ................................................................ 12
4.8 Spare parts ................................................................ 12
4.9 Ordering Spare Parts ................................................. 12
5 Transport, Packaging and Storage ............................. 12
5.1 Transport inspection ................................................... 12
5.2 Packing ...................................................................... 12
5.3 Storage ...................................................................... 13
Content
6 Assembly and installation
of the LoadStar-S ....................................................... 13
7 Installation example LoadStar-S .............................. 19
8 Block Diagram LoadStar-S ......................................... 20
9 Commissioning and further work ............................ 21
10 Luminaire addressing ............................................... 21
11 Checking the wiring ................................................. 21
12 Voltage measurements ............................................ 21
13 Insulation measurement .......................................... 21
14 Check the fuses of the mains
or battery power supply. ......................................... 22
15 Switching on the system ........................................ 23
16 Device Configuration ................................................ 23
16.1. Table Usergroup ....................................................... 29
16.2. Data download table via
PC software and USB stick .................................. 33
16.3. Configure basic settings table
(login = untrained specialist) .................................. 33
16.4. Table Circuit Setup
(Login = Uninstructed specialist)
............................................................................... 37
16.5. Table configure Luminaire setup
(Login = Uninstructed specialist) ............................ 39
16.6. Table configure IO/3PM-IO Setup
(Login = Uninstructed specialist) ............................ 40
16.7. Table configure ACU settings (Login = Expert) ....... 41
16.8. Table Configure PSU Settings (Login = Expert) ...... 42
16.9. Charge voltage setting table (Login=Expert).......... 43
16.10. Table Set Up Web Server (Login Expert) ................ 44
16.10.1 Remote access table via web browser ............... 44
16.11. Table GLT Settings configuration (Login = Expert) 45
16.12. Table create user groups (Login Expert) ............... 46
16.13. Table functional test (Login Operator) ................... 47
16.14. Table e-mail settings(Login Expert) ........................ 47
16.15. Table troubleshooting (Login Operator) ................. 48
16.16. Connecting the LoadStar-S to the VisionGuard visua-
lization software .................................................... 49
17 General product description LoadStar-S ............... 50
18 Overview of assemblies .......................................... 51
19 HMI Color Touch Screen 4,3“ and 7“ ....................... 51
19.1. Table Recommendation
Programming and configura
20 ACU Module ............................................................. 54
21 PSU Module .............................................................. 58
22 AC Module ................................................................. 59
23 BCM.1 Module .......................................................... 60
24 CM.1 1,7 A Charging modules ................................ 63
25 CM 3,4 A Charging modules .................................... 63
Content