98
10 Maintenance / Checking
Mounting and Operating Instructions CEAG Central Battery System ZB-S 40071860179 (L) November 2018 www.ceag.de
Overview:
Main menu
Test & status menu
Block,reset
Basic settings
DLS/TLS Setup
Circuit setup
Luminaire setup
Memory card
Send ServicePinMsg
Menu 2
Block device
Release device
Manual reset
Deep discharge
reset
ISO failure reset
ISO failure search
Selection of
menu options
with the
keys
<ok>:
<ok>
Menu 2.1:
Block device
Release device
Manual reset
Deep
discharge
reset
This device
all devices
Device address 01
Device name
Block device
Release device
Manual reset
Deep
discharge reset
<ok> initiates the function:
The selected stations will be swichted
free and restart operation.
Selection with the buttons bet-
ween the displayed options.
Selection of a ZB-S system with
Device address referes to search
results in the substation setup
menu 3 «Basic settings»
<ok>
Menu 2.2:
This device
all devices
Device address 01
Device name
<ok> initiates the function:
All functions are cancelled;
all outputs will be isolated!
In case of mains failure occures
no battery operation.
10.3 Enabling of end circuits with maintenance
work
Block the system via the control unit (figure).
(menu item 8.4.2)
Before commencing maintenance work in the end circuit this must
be separated on all poles.For this, remove the end circuit fuses on
the module and open the neutral conductor disconnection terminal
at the output terminal.
After maintenance work is finished, reverse the steps and cancel
blocking at the control unit.
10.4 ESF-E30 Activate fan for maintenance work
A plug-in fuse is located
on the connection terminal
block in the upper area of the
distributor for protecting the
technical ventilation. If the
fan is taken out of operation
during maintenance work then
this fuse can be removed.
Switching off the fan by
adjusting the thermostat is not
permitted.