Operation
4812164901_A.pdf
2022-11-14
Battery
status light
The battery status light remains illuminated for about 2
seconds and will then flash twice before the battery
finally shuts down completely. (the shutdown
sequence takes approximately 3-4 seconds).
At the end of the shift, fold over the instrument cover
(4) and lock.
Store the keys to the machine in a safe place to
prevent unauthorized use.
Store the keys to the machine in a safe place to
prevent unauthorized use.
Parking
Chocking the drums
Fig. Positioning
1. Chock
1
Never leave the operator platform without
activating the parking brake.
Never leave the operator platform without
activating the parking brake.
Switch off the machine in accordance with the
shutdown procedure.
Make sure that the roller is parked in a safe place
with respect to other road users. Chock the drums
if the roller is parked on sloping ground.
Make sure that the roller is parked in a safe place
with respect to other road users. Chock the drums
if the roller is parked on sloping ground.
Make sure that the battery hood is locked; there is no
need to open the battery hood other than during
service.
Remember that there is a risk of freezing during
the winter. Drain the water tanks and water lines.
See also maintenance instructions.
Remember that there is a risk of freezing during
the winter. Drain the water tanks and water lines.
See also maintenance instructions.
Before using the roller again, make sure that the
battery pack has a good charge level and that the
parking brake is activated. The chocks can then be
removed and the machine started in accordance
with the start-up procedure.
Before using the roller again, make sure that the
battery pack has a good charge level and that the
parking brake is activated. The chocks can then be
removed and the machine started in accordance
with the start-up procedure.
71
Summary of Contents for CC1000 e
Page 2: ......
Page 10: ...e 4812164901_A pdf 2022 11 14...
Page 28: ...Technical specifications 4812164901_A pdf 2022 11 14 18...
Page 66: ...Machine description 4812164901_A pdf 2022 11 14 56...
Page 82: ...Operation 4812164901_A pdf 2022 11 14 72...
Page 92: ...Operating instructions Summary 4812164901_A pdf 2022 11 14 82...
Page 94: ...Operating instructions Summary 4812164901_A pdf 2022 11 14 84...
Page 96: ...Preventive maintenance 4812164901_A pdf 2022 11 14 86...
Page 108: ...Maintenance 50h 4812164901_A pdf 2022 11 14 98...
Page 112: ...Maintenance measures every other month 4812164901_A pdf 2022 11 14 102...
Page 118: ...Maintenance measures 500 h 4812164901_A pdf 2022 11 14 108...
Page 129: ......
Page 130: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...