Maintenance - Maintenance schedule
4812164901_A.pdf
2022-11-14
Every 1000 hours of operation
Refer to the contents to find the page number of the
sections referred to !
Pos.
Action
Comment
Pos.
Action
Comment
4
Clean the outside/inside of the radiator core
In dusty environments, as
necessary
4
Clean the outside/inside of the radiator core
In dusty environments, as
necessary
2
Check lubrication on controls and joints
Lubricate if necessary
2
Check lubrication on controls and joints
Lubricate if necessary
13
Check the hydraulic reservoir cover/breather
13
Check the hydraulic reservoir cover/breather
12
Change hydraulic fluid filter
12
Change hydraulic fluid filter
16
Change the oil in the drums
16
Change the oil in the drums
Every 2000 hours of operation
Refer to the contents to find the page number of the
sections referred to !
Pos.
Action
Comment
Pos.
Action
Comment
4
Clean the outside/inside of the radiator core
In dusty environments, as
necessary
4
Clean the outside/inside of the radiator core
In dusty environments, as
necessary
2
Check lubrication on controls and joints
Lubricate if necessary
2
Check lubrication on controls and joints
Lubricate if necessary
16
Check the oil level in the drums
16
Check the oil level in the drums
13
Check the hydraulic reservoir cover/breather
13
Check the hydraulic reservoir cover/breather
12
Change hydraulic fluid filter
12
Change hydraulic fluid filter
13
Change the hydraulic fluid
13
Change the hydraulic fluid
16
Change the oil in the drums
16
Change the oil in the drums
1
Drain and clean the water tank
1
Drain and clean the water tank
15
Check the condition of the articulation
15
Check the condition of the articulation
92
Summary of Contents for CC1000 e
Page 2: ......
Page 10: ...e 4812164901_A pdf 2022 11 14...
Page 28: ...Technical specifications 4812164901_A pdf 2022 11 14 18...
Page 66: ...Machine description 4812164901_A pdf 2022 11 14 56...
Page 82: ...Operation 4812164901_A pdf 2022 11 14 72...
Page 92: ...Operating instructions Summary 4812164901_A pdf 2022 11 14 82...
Page 94: ...Operating instructions Summary 4812164901_A pdf 2022 11 14 84...
Page 96: ...Preventive maintenance 4812164901_A pdf 2022 11 14 86...
Page 108: ...Maintenance 50h 4812164901_A pdf 2022 11 14 98...
Page 112: ...Maintenance measures every other month 4812164901_A pdf 2022 11 14 102...
Page 118: ...Maintenance measures 500 h 4812164901_A pdf 2022 11 14 108...
Page 129: ......
Page 130: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...