Operation
4812164901_A.pdf
2022-11-14
Store and handle the battery charger with a cable
so that neither the charger nor the charging
connection are damaged.
Store and handle the battery charger with a cable
so that neither the charger nor the charging
connection are damaged.
Operator's seat - Adjustment
3
4
Fig. Driver seat (MSG20)
1. Locking lever - Length adjustment
2. Weight adjustment
3. Backrest inclination
4. Seat belt
2
1
Adjust the operator’s seat so that the position is
comfortable and so that the controls are within easy
reach.
The image to the left shows a normally equipped
comfort seat.
The seat can be adjusted as follows:
- Length adjustment (1)
- Weight adjustment (2)
- Back support angle (3)
Always make sure that the seat is secure before
beginning operation.
Always make sure that the seat is secure before
beginning operation.
Remember to use the seat belt (4).
Remember to use the seat belt (4).
Instruments and lamps - Checking
2
3
4
5
1
Fig. Instrument panel
1. Ignition key
2. Emergency stop
3. Parking brake
4. Display
5. Sprinkler activation button
Make sure that the emergency stop (1) is pulled
out and the parking brake (2) is activated.
Make sure that the emergency stop (1) is pulled
out and the parking brake (2) is activated.
Turn the ignition key (1) to position 1.
Check that the warning lamps on the display (4) light
up during a short sequence, this is a self-test of the
function of the lamps
Activate the sprinkler button (5) and check that the
system works.
62
Summary of Contents for CC1000 e
Page 2: ......
Page 10: ...e 4812164901_A pdf 2022 11 14...
Page 28: ...Technical specifications 4812164901_A pdf 2022 11 14 18...
Page 66: ...Machine description 4812164901_A pdf 2022 11 14 56...
Page 82: ...Operation 4812164901_A pdf 2022 11 14 72...
Page 92: ...Operating instructions Summary 4812164901_A pdf 2022 11 14 82...
Page 94: ...Operating instructions Summary 4812164901_A pdf 2022 11 14 84...
Page 96: ...Preventive maintenance 4812164901_A pdf 2022 11 14 86...
Page 108: ...Maintenance 50h 4812164901_A pdf 2022 11 14 98...
Page 112: ...Maintenance measures every other month 4812164901_A pdf 2022 11 14 102...
Page 118: ...Maintenance measures 500 h 4812164901_A pdf 2022 11 14 108...
Page 129: ......
Page 130: ...Dynapac Compaction Equipment AB Box 504 SE 371 23 Karlskrona Sweden www dynapac com...