4.7
5G/LTE MODULE
4
Replacement Procedures
PORTÉGÉ X30W-J, dynabook V*/VZ*/VC* Series Maintenance Manual (960-941) [CONFIDENTIAL] 4-29
Installing the 5G/LTE MODULE
To install the 5G/LTE MODULE, follow the steps below and refer to Figure 4-9.
1.
Connect the
5G MODULE
to the connector
CN2610
or
LTE MODULE
to the
connector
CN2600
on the SYSTEM BOARD and secure it with the following
screw
.
M2
2.3C S-THIN HEAD screw
1
2.
Connect the
ANTENNA CABLEs
(4 cables for 5G model, 2 cables for LTE model)
to the connectors on the
5G
MODULE
or
LTE MODULE
NOTE:
Connect the cables according to the following order and steps;
<
5G model
>
AUX
→
MIMO2
→
MIMO1
→
MAIN
・
Detailed steps
AUX MIMO2
MIMO1
MAIN
②
Pass the AUX cable (blue) under the
System board corner first. Then hook it to the
boss.
①
Connect the AUX cable (blue) to the AUX
connector on the 5G module.
Do not pass the cable on
the rib
.
③
Stick the AUX cable (blue) to the INSU. To
make the space for MIMO1 and MIMO2
cables, stick it to the KB side.
INSU
System board
Do not pass the cable on
the rib
.
②
Pass the MIMO2 cable (black) along to
the AUX cable (blue).
①
Connect the MIMO2 cable (black) to the
MIMO2 connector on the 5G module.
③
Stick the MIMO2 cable (black) to the
INSU. To make the space for MIMO1 cable,
stick it along to the AUX cable (blue).
Rev.01
Summary of Contents for PORTEGE X30W-J
Page 11: ...Chapter 1 Hardware Overview...
Page 39: ...Chapter 2 Troubleshooting Procedures...
Page 139: ...Chapter 4 Replacement Procedures...
Page 229: ...CONFIDENTIAL Appendices...