
3-27
CHAPTER 3 STARTING BINDING OPERATION
Lower scoring roller
Upper scoring roller
8.
Align the concave part of the upper
scoring roller with the convex part of
the lower scoring roller.
9.
Tighten the knob of the upper
scoring roller.
10
. Tighten the knob screw (1) of the
upper scoring roller by hand.
11
. Loosen the knob of the upper
scoring roller.
Scoring depth adjustment
Lower scoring
roller
Upper scoring roller
Gap
Fixing screw
12
. Adjust the gap between the upper
scoring roller and the lower scoring
roller using the scoring depth
adjustment.
13
. Tighten the knob of the upper
scoring roller.
14
. Repeat the steps 1 to 13 for the wing
scoring on the non-operator's side.
15
. Perform a test feed to check the
scoring depth.
Summary of Contents for DPB-500
Page 15: ...Chapter 1 BEFORE OPERATION...
Page 36: ...1 22 CHAPTER 1 BEFORE OPERATION Memo...
Page 37: ...Chapter 2 PREPARING FOR OPERATION...
Page 59: ...Chapter 3 STARTING BINDING OPERATION...
Page 86: ...3 28 CHAPTER 3 STARTING BINDING OPERATION Memo...
Page 87: ...Chapter 4 FINE ADJUSTMENT AND OPTION SETTING...
Page 116: ...4 30 CHAPTER 4 FINE ADJUSTMENT AND OPTION SETTING Memo...
Page 117: ...Chapter 5 CLEANING THE UNIT...
Page 127: ...Chapter 6 TROUBLESHOOTING GUIDE...
Page 145: ...Chapter 7 APPENDIX...
Page 147: ...7 3 CHAPTER 7 APPENDIX Memo...
Page 148: ...11H 92832 0 09050000D This manual is printed on recycled paper to help protect the environment...